Text · original
The Chinese translation is being made; the original is shown for now.
Parque solar y BESS Auren ingresa a evaluación ambiental por US$ 61 millones
Public on this site
智利Auren光伏电站及锂离子电池储能项目(BESS)以环境影响声明(DIA)进入环评,投资约6100万美元,位于安托法加斯塔(Antofagasta)大区,装机35 MWac(37.96 MWp),配套35 MW储能。项目由Parque Artemis II SpA持有、与Sungrow Power Chile关联,拟直接向埃斯孔迪达铜矿(Minera Escondida)供电,计划2028年7月开工,建设期用工峰值144人。
The Chinese translation is being made; the original is shown for now.
Source: Reporte Minero · 行业资讯 · reporteminero.cl
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us