Text · original
The Chinese translation is being made; the original is shown for now.
Sonoro Gold Avanza a Ingeniería: Cerro Caliche Pasa de Exploración a Diseño de Factibilidad
Public on this site
Sonoro Gold 已完成 Cerro Caliche 金矿的岩土工程勘察,并启动可行性研究阶段的工程设计,拟采用堆浸工艺建设露天矿。BBA Consultants 负责堆浸设施设计,Ausenco México 担任项目首席工程顾问;最终堆浸设计预计于2027年第一季度末完成。
The Chinese translation is being made; the original is shown for now.
Source: Minería en Línea · 行业资讯 · mineriaenlinea.com
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us