Skip to content
IRMA 负责任采矿保证倡议 · 官方动态· IRMA·· 25 d agoAI score22.0

ERM CVS 将对 Valterra 旗下南非 Amandelbult 矿开展 IRMA 现场审核

On-site Audit of Valterra’s Amandelbult, Nov & Dec 2026

Public on this site

AI summary

独立审核机构 ERM CVS 宣布,将于 2026 年 11 月 16—18 日及 11 月 30 日—12 月 3 日对南非林波波省 Valterra Platinum 的 Amandelbult 采矿综合体开展 IRMA 负责任采矿标准的现场续证审核。该矿产出铱、铂、钯、铑和钌,审核期间将向社区成员、矿工和政府官员等利益相关方征集意见,书面反馈截至 12 月 3 日。

Text · original

The Chinese translation is being made; the original is shown for now.

[isiXhosa | Sepedi | Setswana]

ERM CVS Seeks Input from Local Community and Other Stakeholders

Today, 14 October 2026, independent audit firm ERM CVS announces that from 16–18 November 2026 and again from 30 November – 3 December 2026 it will visit the Valterra Platinum Amandelbult mining complex in South Africa’s Limpopo province to conduct the on-site phase of its independent, third-party renewal audit of the operation’s performance against the Initiative for Responsible Mining Assurance (IRMA) Standard for Responsible Mining. Amandelbult extracts iridium, platinum, palladium, rhodium and ruthenium.

While onsite, auditors will collect feedback from interested local stakeholders – anyone directly or indirectly affected by the mine – including community members, mine workers, and government officials. Auditors will also inspect the operation and its associated facilities. Information can be submitted to the auditors prior to the onsite audit dates until the last date of the onsite audit.

An IRMA assessment results in a public audit report published on the IRMA website (see below for link). IRMA audit reports summarize the audit process, explain how and why the site scored against each of the 400+ requirements of the IRMA Standard, and refresh the site’s IRMA Achievement level. Interested parties may request a physical copy of the report from the audited site.

The audited site can use the findings from the audit to improve its practices. Stakeholders, particularly rights holders, affected communities and mine workers, may use the results of this audit and past audit reports to gain detailed information about the site and empower more collaborative engagement on improvements that matter most to them.

ONSITE AUDIT DATES:
16–18 Nov 2026, and 30 Nov – 3 Dec 2026

Your comments will help ERM CVS assess the impact of Valterra Platinum’s Amandelbult mine on local communities and measure its performance against best mining practices. ERM CVS invites you to sign-up for an interview with auditors during the audit, and/or submit written comments about Valterra Platinum Amandelbult mine using the contact details below.

Interviews can be held in English, Setswana, Sepedi and isiXhosa. Interviews requested by 9 November 2026 can be conducted in-person or remotely. Interview requests made after 9 November 2026 can be in-person if time permits, and remotely if not. Feedback and written comments submitted before 3 December 2026 will be considered.

On the web

Email:
RMM@ermcvs.com

Telephone/WhatsApp: +1 (514) 825 7486

Web QR code:

https://www.erm.com/ermcvs/services/sector-specific-certification-schemes/irma-stakeholder-feedback-form/ 查看配图:QR code linking to the ERM CVS IRMA stakeholder feedback form

Interviews with members of the community occur without mine personnel present. Interviews with non-management workers occur without management present and can be scheduled to occur offsite on request. IRMA auditors protect the identity of individual commenters although the general nature of comments will be summarized in the report.

More information is available as indicated below:

The post On-site Audit of Valterra’s Amandelbult, Nov & Dec 2026 appeared first on IRMA - The Initiative for Responsible Mining Assurance.

Source: IRMA 负责任采矿保证倡议 · 官方动态 · responsiblemining.net

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

Event follow-ups

See the full event

More actions