Skip to content
Australian Mining · 行业资讯· Adam Daunt·· 26 d agoAI score38.0

Alkane Resources 在新南威尔士州 Peak Hill 项目发现深部金矿化潜力

Alkane finds deeper gold potential at Peak Hill

Public on this site

AI summary

Alkane Resources 在新南威尔士州 Peak Hill 项目 Proprietary 露天采坑约 1km 深处发现金铜矿化,1651m 金刚石钻孔 PHD084 从 1427m 起返回 153m 品位 0.11g/t Au 和 0.02% Cu。

Text · original

The Chinese translation is being made; the original is shown for now.

查看配图
Image: Enrique del Barrio/stock.adobe.com

Alkane Resources is considering a new drilling campaign after identifying gold-copper mineralisation approximately 1km beneath the former Proprietary open pit at its Peak Hill project in New South Wales (NSW).

A 1651m diamond drill hole, PHD084, intersected alteration and low-grade mineralisation that Alkane believes could indicate the continuation of the Peak Hill epithermal gold system at depth.

The drilling returned 153m at 0.11g/t gold (Au) and 0.02 per cent copper (Cu) from 1427m, including 4.8m at 0.46g/t Au and 0.06 per cent copper.

A separate intersection returned 6.4m at 0.42g/t Au from 1000.6m, including 2m at 1.02g/t Au.

The program was supported by a $165,000 NSW Government exploration grant and was initially designed to investigate the potential for a deeper copper-gold porphyry system.

Alkane managing director Nic Earner said the drilling had identified an opportunity for additional exploration.

“Whilst the hole did not resolve the target, it did highlight the potential for the shallow epithermal gold resource at Peak Hill to extend to a significant depth below the Proprietary pit,” he said.

“The drilling highlights the potential for mineralisation to continue at significant depth beneath Peak Hill and identifies a substantial area for further exploration.”

Peak Hill is located approximately 60km southwest of Dubbo and 10km south of Alkane’s operating Tomingley gold mine. The former open-pit operation, which mined gold between 1998 and 2005, is currently under care and maintenance.

Its existing underground inferred mineral resource stands at 1.02 million tonnes grading 3.29g/t Au and 0.15 per cent Cu.

Alkane is planning six additional diamond drill holes totalling 6600m, with drilling scheduled to begin in November and assay results expected in 2027.

The campaign will investigate the continuity of gold mineralisation between the existing resource and the deeper intersection, while a separate geological study will review potential copper-gold porphyry targets.

Subscribe to Australian Mining and receive the latest news on product announcements, industry developments, commodities and more.

Australian Mining.

Source: Australian Mining · 行业资讯 · australianmining.com.au

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Related coverage

Representative reportFrom the party involved or an official body

Alkane Resources 在 Peak Hill 金矿 Proprietary 露天矿下方 1 公里深处钻获浅成低温热液矿化

Alkane Resources · 官方动态 · 2026-10-15 06:41

Alkane Resources 在新南威尔士州 Peak Hill 金矿项目完成 1,651 米金刚石钻孔 PHD084,在 Proprietary 露天矿下方约 1 公里处钻获与地表类似的浅成低温热液矿化,分析显示硫化物矿化中含金铜但品位低于上方矿体。

LatestFrom the party involved or an official body

Alkane Resources 在 Peak Hill 金矿 Proprietary 露天矿下方 1 公里深处钻获浅成低温热液矿化

Alkane Resources · 官方动态 · 2026-10-15 06:41

Alkane Resources 在新南威尔士州 Peak Hill 金矿项目完成 1,651 米金刚石钻孔 PHD084,在 Proprietary 露天矿下方约 1 公里处钻获与地表类似的浅成低温热液矿化,分析显示硫化物矿化中含金铜但品位低于上方矿体。

Something wrong? Tell us

Event follow-ups

See the full event

More actions