Text · original
The Chinese translation is being made; the original is shown for now.
Montero Mining accede a base de datos histórica para proyecto Avispa
Public on this site
Montero Mining依据与必和必拓(BHP) Chile Inc.于2026年11月9日披露的协议,取得智利北部Avispa铜钼项目的历史勘探数据库,包含34个钻孔和约2,700条化验记录。公司已开始核查与验证这批由前作业者生成、尚未经其全面独立核实的数据,并将结合地质、地球化学和地球物理数据,用人工智能与机器学习辅助识别斑岩铜钼系统的优先勘探目标。Montero还在洽购约一半剩余钻孔实物样品,用于选择性复检。
The Chinese translation is being made; the original is shown for now.
Source: Reporte Minero · 行业资讯 · reporteminero.cl
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us通过BHP Chile Inc.向Montero Mining授权Avispa铜钼项目的历史勘探数据库,含34个钻孔和约2700条化验记录。
Source of the data: 原文依据