Skip to content
Zambia Chamber of Mines · 官方动态· Lee Muzala·· 2024-04-17AI score58.0

赞比亚矿业商会呼吁ZESCO在拉闸限电期间保护矿山资产

Zambia Chamber of Mines calls on ZESCO to help protect Mine Assets during load shedding

Public on this site

AI summary

赞比亚矿业商会理事会呼吁ZESCO、政府和整个能源行业优先保护井下通风、矿山排水设施和铜冶炼炉资产,避免因停电造成不可修复的损坏。商会称,ZESCO已向部分会员企业发出电力供应不可抗力通知,厄尔尼诺引发的严重干旱已降低Kariba大坝水位,井下采矿和铜冶炼作业无法完全免受间歇性供电减少的影响。

Text · original

The Chinese translation is being made; the original is shown for now.

The Council of the Zambia Chamber of Mines has called on Zambia’s electricity supplier ZESCO, the Government and the entire energy sector to prioritise the protection of underground mine ventilation, mine dewatering infrastructure and Copper Smelter furnace assets from irreparable damage associated with power outages at this time of load shedding.

“We appeal for heightened vigilance from ZESCO to prioritize ventilation and dewatering of underground mining operations and  prevention of freezing over of smelter furnaces even under notice of Force Majuere served on Chamber of Mines member companies.’ Reads the Council resolution of its second quarter meeting.

The loss of any of these assets from mines such as Mabiza in the south to Lumwana, Kansanshi, Konkola, Nchanga or Mufulira in the North will be calamitous for the Copper and Nickel mining industry and the nation’s economic prospects.

The Chamber of Mines Council fully and steadfastly supports ZESCO as it manages this daunting climate change by securing and availing to the mining industry and other sectors of the economy power supply alternatives.

ZESCO has served notices of force majeure on supply of electricity to several of the Chamber of Mines members. The industry is alive to reports that the ongoing severe El-Niño induced drought has lowered the Kariba Dam’s water levels such that underground mining and copper smelting operations, can no longer be completely insulated from intermittent reductions in levels of power supply.

The Chamber membership stands ready to swiftly cooperate with the Government by participating in time bound and predictably proportioned alternative power supply sourcing arrangements to enable the sector and country navigate the challenging circumstances.

Ends//

Download Press Statement

查看配图:Icon

Press Statement - Load-shedding.

1 file(s) 65.33 KB

Download

Source: Zambia Chamber of Mines · 官方动态 · mines.org.zm

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

More actions