Skip to content

Leading Edge Materials 就罗马尼亚 Bihor Sud 多金属勘探项目提交 CPR

LEADING EDGE MATERIALS’ FILES CPR FOR BIHOR SUD POLYMETALLIC EXPLORATION PROJECT, ROMANIA

Public on this site

AI summary

Leading Edge Materials 已在 SEDAR 提交罗马尼亚 Bihor Sud 多金属勘探项目的合资格人士报告(CPR),该报告由 Addison Mining Services 编制,依据 NI 43-101 和 CIM 定义标准完成。2025 年勘探活动在 Valea Leucii、Dibarz 和 Avram Iancu 地下发现大面积矿化,历史探槽岩屑样品品位最高达 28% Ni、>6% Co,一件样品金品位 17.75 ppm。矿化带可能南北向延伸约 6 公里、东西向相近。

No text on this site yet

There is no complete text to show here yet. Read the summary, or open the source site to continue.

Open the original source

Source: Leading Edge Materials · 官方新闻 · leadingedgematerials.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

More actions