Skip to content
Australian Mining · 行业资讯· Adam Daunt·· 12 d agoAI score55.0

Genesis Minerals 向 Brightstar 投资 3000 万澳元,参与 8200 万澳元配售

Genesis Minerals stakes its claim in Brightstar’s future

Public on this site

AI summary

Genesis Minerals 将向 Brightstar Resources 投资 3000 万澳元,作为后者 8200 万澳元配售的一部分,用于加快西澳 Sandstone 金矿项目的勘探与开发。Genesis 将以每股 0.50 澳元认购 6000 万股新股,持股比例从约 0.8% 升至 5.4%。近期钻探将 Two Mile Hill–Shillington 的资源量提升至 145 万盎司黄金,整个 Sandstone 项目资源量为 360 万盎司;Brightstar 计划加快 Shirvington 矿区 6500 米金刚石钻探,预可行性研究目标定在 12 月季度。公司同时表示,Goldfields 项目建设按计划、按预算推进,Laverton 选厂已完成约 47%,首次产金目标为 2027 年 6 月季度。

Text · original

The Chinese translation is being made; the original is shown for now.

查看配图:Genesis Minerals
Image: Phang/stock.adobe.com

Genesis Minerals is investing $30 million in Brightstar Resources as part of an $82 million capital raising to accelerate exploration and development at the Sandstone gold project in Western Australia.

Under the placement, Genesis will acquire 60 million new Brightstar shares, increasing its interest from approximately 0.8 per cent to 5.4 per cent following completion.

Brightstar has secured binding commitments for the placement, with shares priced at $0.50 each.

The company said the proceeds would support an expanded exploration program at Sandstone, where recent drilling has increased the mineral resource estimate at Two Mile Hill–Shillington to 1.45 million ounces of gold. The broader Sandstone project has a reported mineral resource of 3.6 million ounces.

Brightstar managing director Alex Rovira said the latest results had prompted the company to reconsider the scale of its planned exploration activities.

“The true size of Sandstone is quickly emerging, which now warrants a faster and larger work program than we scoped at the start of the year,” Rovira said.

“This capital raising allows us to fast-track the  exploration workstreams to define and enhance what an enlarged Sandstone development will look like.”

Brightstar plans to use part of the placement proceeds to accelerate a 6500m diamond drilling program targeting the Shirvington Zone, alongside further infill and extensional drilling at Two Mile Hill.

The company is also assessing an early mining strategy at Sandstone, including a potential cutback of the existing open pit and development of an underground exploration decline.

A pre-feasibility study is targeted for the December quarter, with Brightstar planning a subsequent definitive feasibility study that will incorporate further assessment of underground mining opportunities.

Separately, Brightstar reported that construction of its Goldfields project remained on schedule and on budget. The company said its Laverton processing plant was approximately 47 per cent complete, with first gold production targeted for the June quarter of 2027.

Brightstar said the $82 million placement would support its accelerated Sandstone work program without changing the existing funding arrangements for the Goldfields development.

Subscribe to Australian Mining and receive the latest news on product announcements, industry developments, commodities and more.

Australian Mining.

Source: Australian Mining · 行业资讯 · australianmining.com.au

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

Event follow-ups

See the full event

More actions