Text · original
The Chinese translation is being made; the original is shown for now.
Seawater Desalination in Chile and the Future of Copper in San Juan: Technical and Economic Aspects and the Debate over Mining Professionals
Public on this site
采矿工程师Mario Juárez分析从智利向阿根廷圣胡安铜矿输送淡化海水的技术与经济可行性,认为相关基础设施可行,不会损害项目的国际成本竞争力。他指出智利北部矿山已有海水淡化与泵送系统的资本支出和运营支出先例,阿根廷一侧可依靠重力管道输水,并援引Minera Alumbrera约360公里矿浆管道作为山地管道施工参照。他还质疑矿业专业人才短缺的说法,认为过半缺口源于招聘流程缺陷。
The Chinese translation is being made; the original is shown for now.
Source: Panorama Minero · 行业资讯 · panorama-minero.com
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us