Skip to content
KAZ Minerals · 官方动态· Fuel Integrated·· 2025-02-10AI score42.0

KAZ Minerals发布2024年第四季度及全年产量报告

Q4 2024 Production Report

Public on this site

AI summary

KAZ Minerals 2024年全年铜产量为380 kt(2023年:403 kt),黄金产量145.8 koz,白银产量3,728 koz,锌精矿含锌42.8 kt。全年处理矿石96.5 Mt,同比增长6%,创集团纪录,Aktogay与Bozshakol选矿厂持续超设计产能运行。第四季度铜产量92.9 kt,铜销量91.8 kt。

Text · original

The Chinese translation is being made; the original is shown for now.

KAZ MINERALS PRODUCTION AND SALES REPORT FOR TWELVE MONTHS AND THE FOURTH QUARTER ENDED 31 DECEMBER 2024

  12m
2024
12m
2023
Q4 2024 Q3 2024 Q4 2023
Copper production1 kt 379.9 403.4   92.9  96.1 102.2
Aktogay kt 228.8 252.4 56.6  58.3 60.4
Bozshakol kt 104.7 104.6 25.5  25.8 27.1
East Region & Bozymchak kt 46.4 46.4 10.8  12.0 14.7
Gold production2 koz 145.8 162.0 34.9  35.0 41.7
Silver production2 koz 3,728 4,008 978  875 1,004
Zinc in concentrate kt 42.8 51.4 11.5  8.8 15.0
Copper sales3 kt 386.8 445.4   91.8  91.9 101.2
Gold sales4 koz 150.8 178.8   30.4  36.4 38.2
Silver sales4 koz 3,836 4,107   822  1 126 916
Zinc in concentrate sales kt 44.3 52.9   8.6  10.4 11.6

1. Payable metal in concentrate and copper cathode from Aktogay oxide ore
2. Payable metal in concentrate
3. Payable metal in concentrate, toll processed metal and copper cathode from Aktogay oxide ore
4. Payable metal in concentrate and toll processed metal

Highlights

  • KAZ Minerals processed 96.5 Mt of ore in 2024, a 6% year-on-year increase and a record for the Group.
  • Copper production for the year was 380 kt (2023: 403 kt) as the increase in ore throughput was offset by an expected reduction in grades processed, as the ore bodies mature.
  • Production of gold, silver and zinc in 2024 reduced compared with the prior year as mining took place in areas with lower polymetallic content.
  • Copper sales of 387 kt were 2% higher than production, benefiting from the sale of material held in transit at the beginning of the year.

Andrew Southam, Chief Executive Officer, said: “In 2024, KAZ Minerals set a new milestone by processing 96.5 Mt of ore, a record for the Group and a 6% increase versus 2023. The concentrators at Aktogay and Bozshakol continued to perform above design capacity, highlighting the Group’s commitment to operational excellence.”

For further information please contact:

KAZ Minerals    
Maksut Zhapabayev

Gillian Little

Corporate Communications, Almaty

Company Secretary, Dubai

Tel: +7 727 244 03 53

Tel: +971 4 560 5100

REGISTERED OFFICE

Unit No: 3402, Platinum Tower, Plot No: JLT-PH1-I2, Jumeirah Lakes Towers, Dubai, United Arab Emirates

PLEASE FOLLOW THE LINK TO DOWNLOAD THE FULL ANNOUNCEMENT

The post Q4 2024 Production Report appeared first on Kaz Minerals.

Source: KAZ Minerals · 官方动态 · kazminerals.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

More actions