Skip to content
MININGMETALnews · 行业资讯·AI score32.0

Dillinger France 敦刻尔克厚板厂升级冷矫直机自动化系统,SMS Group 承接改造

New Automation Technology to Improve Steel Production in Dunkirk

Public on this site

AI summary

法国厚板生产商 Dillinger France 在敦刻尔克工厂启动现代化改造项目,由德国 SMS Group 升级现有冷矫直机及自动化系统,安装 X-Pact 自动化系统升级版,计划 2027 年 12 月完工,投资额未披露。

Text · original

The Chinese translation is being made; the original is shown for now.

French heavy plate manufacturer Dillinger France is launching a modernisation project at its production facility in Dunkirk. The investment aims to expand the plant's ability to process new generations of high-strength steel while improving plate flatness and dimensional accuracy. German engineering company SMS Group has been selected to upgrade the existing equipment and automation systems.

The project focuses on the plant's cold plate leveller, which corrects the shape and flatness of steel plates after rolling.

SMS Group will install an upgraded version of its X-Pact automation system, allowing levelling parameters to be adjusted to different steel grades and mechanical properties.

Completion is scheduled for December 2027. The investment value has not been disclosed.

Automated control improves levelling precision

A central element of the upgrade is a new process model that automatically calculates roller positions, bending forces and torque distribution.

The system is designed to improve the levelling of high-strength and demanding steel grades.

An integrated nine-roller and five-roller operating mode will extend the machine's processing range without requiring mechanical adjustments or roller replacement.

The upgraded controls will also allow greater controlled plastic deformation, permanently adjusting plate geometry to achieve the required flatness.

Testing without interrupting production

To minimise operational risks, the new process model will initially operate alongside the existing automation system.

This approach, known as shadow mode, allows the upgraded software to perform calculations without directly controlling production.

Its results can then be compared with actual operating conditions before full implementation.

Thomas Koch of SMS Automation & Digital Solutions says the modernisation will enable Dillinger France to make better use of its existing equipment and expand its processing capabilities.

Heavy plate for wind energy and engineering

Dillinger France produces more than 600,000 tonnes of heavy plate annually at its Dunkirk facility.

Its products are used in offshore wind energy, mechanical engineering, major pipeline construction, pressure vessels and industrial boilers.

Demand for advanced high-strength steels is placing increasing requirements on processing equipment and production control.

The upgrade is intended to broaden Dillinger's product range while improving its ability to manufacture steel plate with demanding strength, flatness and dimensional specifications.

Rather than replacing the entire levelling installation, the project will extend the capabilities of the existing machinery through modern automation and process technology.

Sources: SMS Group and GMK Centre, October 2026.

Source: MININGMETALnews · 行业资讯 · miningmetalnews.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

Event follow-ups

See the full event

More actions