Text · original
The Chinese translation is being made; the original is shown for now.
St George e academia inauguram obras de Centro de Pesquisa
Public on this site
St George Mining与米纳斯吉拉斯州科技创新联邦大学(UFCIMG)于11月24日在阿拉沙校区举行矿物加工与湿法冶金研究中心开工仪式,项目投资超过2500万雷亚尔,计划于2027年上半年投运。中心将设实验室和中试厂,中试厂设计处理能力为每小时200至300公斤矿石,重点开发关键与战略矿产的加工和精炼技术,同时服务St George的Araxá项目及学术研究。双方合作于2025年10月确立,由矿企承担建设与设备采购资金,合作期五年,期满后设施移交大学。
The Chinese translation is being made; the original is shown for now.
Source: Brasil Mineral · brasilmineral.com.br
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us