Text · original
The Chinese translation is being made; the original is shown for now.
Golden Minerals completó ocho perforaciones en el proyecto Desierto en Salta y espera resultados para 2027
Public on this site
加拿大矿企Golden Minerals已完成阿根廷Salta省Desierto项目的钻探,共八个钻孔、总进尺1.336米,覆盖Sico South、Cobre、Alunita和Iceberg四个金铜目标。项目原计划约1.250米、三个目标,公司随后扩大范围并增加第四个目标,岩芯样品已送往ALS Laboratories化验。公司预计在2027年第一季度获得分析结果,届时将判断各目标是否值得开展后续勘探。
The Chinese translation is being made; the original is shown for now.
Source: Minería y Desarrollo · 行业资讯 · mineriaydesarrollo.com
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us