Skip to content
The Northern Miner · 行业资讯· Henry Lazenby·· 13 d agoAI score47.0

Sunshine Silver拟2028年底重启爱达荷州Sunshine银矿,选厂设计预留产能翻倍空间

Mining Forum video: Sunshine builds room for growth into Idaho restart

Public on this site

AI summary

Sunshine Silver Mining & Refining计划于2028年底重启爱达荷州Sunshine银矿,其选厂设计预留了将处理能力翻倍的空间。根据3月的初步评估,该矿前五年年均产银670万盎司,公司预计2027年第二季度完成矿山与选厂可行性研究后再作建设决定。公司还在研究锑厂及银铜精炼厂翻新,两项研究均预计2027年第一季度完成。

Text · original

The Chinese translation is being made; the original is shown for now.

查看配图Sunshine Silver Mining & Refining CEO Heather White last month in Colorado Springs.

Posted By: Henry Lazenby October 27, 2026

Sunshine Silver Mining & Refining (NYSE: SSMR) is designing a mill with room to double throughput as it targets a late-2028 restart of Idaho’s Sunshine silver mine, CEO Heather White says.

The operation, near Kellogg and about 430 km north of Boise, would initially process ore at its base-case rate, with capacity for future expansion. Sunshine’s March initial assessment projects average annual production of 6.7 million oz. silver over the first five years. The company expects to complete its mine-and-mill feasibility study in the second quarter of 2027 before making a construction decision.

“Clearly, getting those feasibility studies wrapped up first half of next year, that will position us to look at what remaining capital would be needed to fund us all the way through to production,” White told The Northern Miner late last month in Colorado Springs.

The restart could restore a sizeable source of U.S. silver supply while creating a platform for domestic metals refining. Sunshine is separately studying an antimony plant and the refurbishment of its silver-copper refinery, with both studies due in the first quarter of 2027, White said.

Watch the full interview with The Miner’s Western Editor, Henry Lazenby:

Print

Related Articles

https://www.northernminer.com/news/video-b2gold-rerating-hinges-on-goose-mali-permit/1003883433/ 查看配图:Video: B2Gold CEO says rerating hinges on Goose, Mali permit

Latest Videos, News, Precious Metals, Video

Video: B2Gold rerating hinges on Goose, Mali permit


https://www.northernminer.com/news/pdac-video-golds-record-run-not-over-wgc-says/1003889663/ 查看配图:PDAC Video: Gold’s record run not over, WGC says

Latest Videos, News, Precious Metals, Stock Markets/Investing, Video

PDAC Video: Gold’s record run not over, WGC says


https://www.northernminer.com/regulatory-issues/london-symposium-jv-video-ontarios-fast-tracking-a-breath-of-fresh-air-beaty-says/1003885533/ 查看配图:London Symposium JV video: Ontario’s fast-tracking ‘A breath of fresh air,’ Beaty says

Joint Venture Article, Latest Videos, Promoted Content, Regulatory Issues, Video

London Symposium JV video: Ontario’s fast-tracking ‘A breath of fresh air,’ Beaty says


https://www.northernminer.com/news/video-magna-mining-starts-bulk-sampling-at-crean-hill-near-sudbury/1003870326/ 查看配图:Video: Magna Mining starts bulk sampling at Crean Hill near Sudbury

Latest Videos, News, Video

Video: Magna Mining starts bulk sampling at Crean Hill near Sudbury


By continuing to browse you agree to our use of cookies. To learn more, click more information

Source: The Northern Miner · 行业资讯 · northernminer.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Related coverage

Representative report

Sunshine Silver 考虑将选厂产能翻倍,目标 2028 年底重启爱达荷银矿

The Northern Miner · 行业资讯 · 2026-11-03 21:00

Sunshine Silver Mining & Refining(NYSE: SSMR)正设计一座日处理能力约 2,000 吨的选厂,约为其初步矿山计划中 1,000 吨的两倍,为爱达荷州 Sunshine 银矿在 2028 年底重启后扩产留出空间。公司计划在明年第二季度完成矿山与选厂可行性研究后再作最终投资决定;3 月的初步评估针对较小规模运营估算资本支出 2.869 亿美元,并预计 24 年矿山寿命前五年年均产银 670 万盎司。公司 6 月 IPO 募资 3.105 亿美元(净额 2.865 亿美元),另有两项可行性研究将评估新建锑厂和重启现有银铜精炼厂,锑厂年产能可达 3,500 万磅(约 15,900 吨)。

Latest

Sunshine Silver 考虑将选厂产能翻倍,目标 2028 年底重启爱达荷银矿

The Northern Miner · 行业资讯 · 2026-11-03 21:00

Sunshine Silver Mining & Refining(NYSE: SSMR)正设计一座日处理能力约 2,000 吨的选厂,约为其初步矿山计划中 1,000 吨的两倍,为爱达荷州 Sunshine 银矿在 2028 年底重启后扩产留出空间。公司计划在明年第二季度完成矿山与选厂可行性研究后再作最终投资决定;3 月的初步评估针对较小规模运营估算资本支出 2.869 亿美元,并预计 24 年矿山寿命前五年年均产银 670 万盎司。公司 6 月 IPO 募资 3.105 亿美元(净额 2.865 亿美元),另有两项可行性研究将评估新建锑厂和重启现有银铜精炼厂,锑厂年产能可达 3,500 万磅(约 15,900 吨)。

Something wrong? Tell us

Event follow-ups

See the full event

More actions