Skip to content
Panorama Minero · 行业资讯·· 3 h agoAI score45.0

Jaguar Uranium计划在阿根廷Huemul项目钻探2万米并2030年完成预可行性研究

Jaguar Uranium Plans 20,000 Metres of Drilling at Huemul and Targets Prefeasibility Study in 2030

Public on this site

AI summary

Jaguar Uranium计划在阿根廷门多萨省南部的Huemul项目开展分阶段钻探,总进尺2万米、总投资1373万美元,首轮3000米金刚石钻探定于2027年9月至12月实施。公司计划2029年4月按SEC S-K 1300标准发布矿产资源报告,2030年5月完成预可行性研究。此前地表采样在Huemul–Agua Botada地区获得最高8.54%铜、2.27%铀、708 g/t银和1.27%钒的拣块样结果。

Text · original

The Chinese translation is being made; the original is shown for now.

Source: Panorama Minero · 行业资讯 · panorama-minero.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

Event follow-ups

See the full event

More actions