Text · original
The Chinese translation is being made; the original is shown for now.
GEM Mining advierte riesgo hídrico ante segundo corte de agua en minería chilena
Public on this site
GEM Mining Consulting的报告指出,智利铜矿选矿厂在遭遇第二次供水中断时存在运营脆弱性,一座500 L/s的选矿厂需225 L/s即时备用水源才能应对。据Cochilco数据,2025年智利矿企从海洋水源取水8.11 m³/s,其中99.6%集中在安托法加斯塔(Antofagasta)、Tarapacá、Atacama和Coquimbo四个大区。报告建议运营方和监管机构除最大储水量外,还应核查故障期间实际供水量及备用系统的恢复能力。
The Chinese translation is being made; the original is shown for now.
Source: Reporte Minero · 行业资讯 · reporteminero.cl
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us