跳到正文
Australian Mining · 行业资讯· Adam Daunt·· 7 天前AI 评分42.0

Waratah Minerals扩大Spur项目金矿勘探版图

Waratah Minerals broadens gold ambitions at Spur

本站公开

AI 导读

Waratah Minerals在新南威尔士州Spur金矿项目完成Ironclad采矿权收购后,将矿化带延伸至6公里走廊。Consols矿区SPD075孔见矿46米、品位7.27克/吨金,为迄今最佳见矿,将已知矿化向北延伸70米、向东延伸150米。Consols早期冶金试验显示重力与常规氰化浸出回收率达89%–93%,后续钻探将于12月季度开展。

正文 · 原文

中文译文生成中,先为你显示原文。

查看配图:Waratah
Image: Lahiru/stock.adobe.com

Waratah Minerals is building a district-scale gold exploration project in New South Wales, with drilling expanding mineralisation across a 6km corridor at its Spur project.

The company’s latest results have strengthened its interpretation of a larger gold system extending beyond its principal Consols and Spur discoveries, while the completed Ironclad acquisition has consolidated its position across the historic mining district.

Located approximately 5km west of Newmont’s Cadia Valley operations, Spur remains an early-stage exploration project, with Waratah working to establish the extent and continuity of its mineralised zones.

Waratah executive chair Andrew Stewart said the results highlighted the potential to establish a larger mineralised system.

“Our September quarter results continue to demonstrate the scale and growth potential of the Spur gold project,” Stewart said.

“At Consols, hole SPD075 delivered our best intercept to date, returning 46m at 7.27g/t gold and extending known mineralisation to the north and east.

“At the Spur Zone, drilling continued to expand and infill mineralisation, while early-stage metallurgical test work at Consols returned strong gold recoveries through gravity and conventional leaching.”

He also said that the completion of the Ironclad Mining lease acquisition strengthens Waratah’s district-scale position, with initial drilling supporting the potential for a broader mineralised system linking Ironclad and Consols.

“Results from Alpine, Gazzards and Gum Flat have added further exploration opportunities across the project,” Stewart said.

“As we enter the December quarter, we remain focused on defining and expanding the known gold zones while systematically testing these targets.”

Drilling at the Consols Zone has traced gold mineralisation across approximately 400m of strike and 400m vertically, with the standout intersection of 46m at 7.27 grams per tonne gold from 541m, including 10m at 28.93 grams per tonne.

The result, originally announced in September, extended known mineralisation 70m north and 150m east of previous drilling, while subsequent October results included 9.86m at 6.71 grams per tonne gold from 710m within a broader 70m intersection grading 1.71 grams per tonne.

Exploration at the neighbouring Spur Zone has expanded the combined mineralised footprint to approximately 550m by 800m, with mineralisation remaining open along strike and at depth.

Further drilling at Alpine and Gazzards has identified shallow gold mineralisation, supporting Waratah’s interpretation of a 6km corridor linking several prospects across the district.

Waratah said that the completion of the Ironclad acquisition has added another dimension to the exploration program, with initial drilling intersecting multiple gold-bearing structures beyond the historic mine footprint.

Results included 30m at 0.47g/t gold from 84m, including 5m at 1.79 g/t gold, supporting further investigation of a possible connection between Ironclad and Consols.

Although the continuity and economic significance of the wider system remain to be established, early-stage metallurgical testing at Consols has returned gold recoveries of 89–93 per cent using gravity and conventional cyanide leaching.

Further test work is underway to develop a processing flowsheet for Spur and Consols, while follow-up drilling at Ironclad, Alpine and Gazzards is planned for the December quarter.

Subscribe to Australian Mining and receive the latest news on product announcements, industry developments, commodities and more.

Australian Mining.

来源:Australian Mining · 行业资讯 · australianmining.com.au

许可:负责人声明许可;来源异议或指示可逐项收紧

原始来源可追溯;中文内容由 AI 辅助生成或翻译,核对细节请看原文。

相关报道

代表稿

Waratah Minerals 公布新南威尔士州 Spur 金矿项目 310 万盎司首次资源量

Australian Mining · 行业资讯 · 2026-11-05 08:46

Waratah Minerals 公布其位于新南威尔士州的 Spur 项目首次矿产资源量为 310 万盎司黄金,估算覆盖 Spur 与 Consols 两个金矿带,资源量 8290 万吨、品位 1.2 g/t 金,其中约 27% 为控制资源量、73% 为推断资源量。该估算基于 175 个钻孔、累计 72,890 米进尺,仅覆盖项目 6 公里重点金矿带中的约 2 公里。公司另给出 510 万至 1040 万盎司的概念性勘探目标,并计划在未来六个月完成约 50,000 米钻探,推动资源量向 500 万盎司增长。

最新进展

Waratah Minerals 在 Spur 与 Essex 之间钻遇宽幅金矿化

Australian Mining · 行业资讯 · 2026-11-09 08:27

Waratah Minerals 在新南威尔士州 Spur 矿床与历史悠久的 Essex 矿山之间发现更多金矿化,两个钻孔分别见矿 170.6 米、金品位 0.61 克/吨和 157 米、金品位 0.57 克/吨,其中包含 21 米、金品位 1.09 克/吨和 6 米、金品位 2.58 克/吨的高品位段。这些结果出现在该公司 11 月 4 日公布 Spur 与 Consols 矿区 310 万盎司、金品位 1.2 克/吨的首次矿产资源量之后,公司目标是通过进一步钻探将资源量提升至 500 万盎司。目前 6 公里长的 Spur 金矿带上有 12 台钻机作业,未来六个月计划钻探约 5 万米。

内容有误?告诉我们

事件后续

查看完整事件

更多操作