跳到正文
Mining Connection · 行业资讯·AI 评分42.0

Blackrock Silver 就 Tonopah West 项目许可设计工程签约 NewFields

Blackrock Silver Awards Civil Engineering Works to NewFields for Permit Designs on Tonopah West

本站公开

AI 导读

Blackrock Silver 与科罗拉多州 Englewood 的 NewFields Mining Design & Technical Services 签订服务协议,为内华达州 Tonopah West 项目的勘探斜坡道、试采及 50,000 吨(55,000 吨)大样提取完成许可设计。NewFields 将编制水污染控制许可和内华达州复垦许可的施工级设计,以及 U.S. Highway 95 接入和地表设施设计,设计预计年底完成,2027 年 1 月提交内华达州环境保护部下属矿业监管与复垦局,审批预计需约 240 至 270 天。

正文 · 原文

中文译文生成中,先为你显示原文。

Published: October 26, 2026 |

Blackrock Silver has entered into a service agreement with NewFields Mining Design & Technical Services of Englewood, Colorado to assist with the design requirements to complete permitting of an exploration decline, test mining, and 50,000 tonnes (55,000 tons) bulk-sample extraction on the company’s Tonopah West Project located in Nye and Esmeralda Counties, Nevada.

NewFields will prepare construction-level designs for Tonopah West’s water pollution control permit and Nevada reclamation permit, U.S. Highway 95 tie in and access, and surface facilities needed to place silver and gold laden rock and associated waste rock material at surface as well as site facilities to support technical, construction and contractor needs.

“Tonopah was one of the greatest silver camps in American history, and we believe its next great chapter starts now. Our PEA was the map. This engineering work is the road. With final permits in view, we look forward to breaking ground next year and taking Tonopah West back underground, where its story left off nearly a century ago,” said Andrew Pollard, Blackrock’s president and chief executive officer.

NewFields will work in concert with the company’s environmental consultants from Trinity Consultants to ensure the engineering work, applications and submissions are complete and consistent.

Designs are anticipated to be completed by year end, with submission to the Bureau of Mining Regulation and Reclamation, a subdivision of Nevada Department of Environmental Protection, anticipated in January 2027. Once the applications and supporting documents are submitted, the review process is expected to take approximately 240 to 270 days to receive approvals.


Blackrock Silver is an American-focused emerging primary silver developer systematically advancing the high-grade Tonopah West project in west-central Nevada, a jurisdiction consistently ranked among the top mining regions globally. The company is focused on unlocking the value of one of the highest-grade undeveloped silver projects in the industry and delivering a secure, domestic source of a metal critical to the U.S. energy and defense supply chains.


Be in-the-know when you’re on-the-go!

FREE eNews delivery service to your email twice-weekly. With a focus on lead-driven news, our news service will help you develop new business contacts on an on-going basis.

CLICK HERE to register your email address.


Copyright © 2026 Mining Connection LLC. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.

For licensing permission, .(JavaScript must be enabled to view this email address)

来源:Mining Connection · 行业资讯 · miningconnection.com

许可:负责人声明许可;来源异议或指示可逐项收紧

原始来源可追溯;中文内容由 AI 辅助生成或翻译,核对细节请看原文。

相关报道

代表稿当事方或官方发布

Blackrock Silver 就 Tonopah West 项目许可设计工程签约 NewFields

Blackrock Silver · 官方新闻 · 2026-10-26

Blackrock Silver 旗下内华达子公司已与 NewFields 签订服务协议,为 Tonopah West 项目勘探斜坡道、试采及 50,000 吨(55,000 吨)散装样品提取的许可设计提供施工级工程设计。设计预计年底完成,计划 2027 年 1 月提交内华达州环境保护部采矿监管与复垦局,审批流程预计约 240 至 270 天。

最新进展当事方或官方发布

Blackrock Silver 就 Tonopah West 项目许可设计工程签约 NewFields

Blackrock Silver · 官方新闻 · 2026-10-26

Blackrock Silver 旗下内华达子公司已与 NewFields 签订服务协议,为 Tonopah West 项目勘探斜坡道、试采及 50,000 吨(55,000 吨)散装样品提取的许可设计提供施工级工程设计。设计预计年底完成,计划 2027 年 1 月提交内华达州环境保护部采矿监管与复垦局,审批流程预计约 240 至 270 天。

内容有误?告诉我们

事件后续

查看完整事件

更多操作