跳到正文
Australian Mining · 行业资讯· Jackson Haddad·· 10 天前AI 评分50.0

Great Boulder 高品位金矿钻探结果提升 Peak Hill 项目前景

High-grade gold results boost Great Boulder’s Peak Hill outlook

本站公开

AI 导读

Great Boulder Resources 在西澳 Peak Hill 金矿项目完成逾 40,000 米钻探,Durack 见 4 米 37.1 克/吨、Jubilee 见 3 米 29.4 克/吨、Golden Treasure 见 12 米 8.56 克/吨。Peak Hill 现有资源量 940 万吨、品位 1.6 克/吨、含金 48.1 万盎司,公司计划年底更新资源量,2027 年底前完成概略研究与可行性研究并准备开采。

正文 · 原文

中文译文生成中,先为你显示原文。

查看配图:Great Boulder
Image: Adwo/stock.adobe.com

Great Boulder Resources has completed more than 40,000m of drilling at its Peak Hill gold project in Western Australia, with early results exceeding expectations and the company targeting a resource update by the end of the year.

The company completed 40,032m of reverse circulation (RC) and diamond drilling during the September quarter, testing the Durack, Jubilee, Enigma, Five Ways and Harmony deposits, as well as the Golden Treasure prospect.

Key results included 4m at 37.1 grams per tonne (g/t) gold from 110m at Durack, 3m at 29.4g/t gold from 39m at Jubilee and 12m at 8.56g/t gold from 8m at Golden Treasure.

Great Boulder said drilling at Durack had exceeded expectations, with high-grade zones remaining open at depth. The company has also identified further potential along the mineralised trend extending towards the Murphy’s Creek target, which it plans to test with exploration drilling in 2027.

At Jubilee, drilling has identified gold mineralisation within a dolerite unit previously interpreted as barren, pointing to potential growth within the existing resource and extensions into newly identified lodes.

The Golden Treasure prospect, which has no estimated mineral resource, returned additional high-grade results. Two diamond holes at the prospect have visible gold, with assays expected during November.

The company plans to update its Peak Hill resource inventory at the end of 2026 before moving into scoping and feasibility studies in preparation for mining at the end of 2027. Peak Hill currently hosts a mineral resource of 9.4 million tonnes at 1.6g/t gold for 481,000 ounces.

Drilling also continued at Great Boulder’s Side Well gold project, where the Mulga Bill East area has grown to approximately 1.5km of strike and remains open to the north, south and at depth.

Results included 2m at 30.76g/t gold from 133m, including 1m at 60.9g/t, and 2.64m at 14.62g/t from 292.36m.

The company is targeting a Side Well resource of more than 1.5 million ounces in the short term, while advancing development plans for the project. Great Boulder held $12.3 million in cash at the end of September.

Subscribe to Australian Mining and receive the latest news on product announcements, industry developments, commodities and more.

Australian Mining.

来源:Australian Mining · 行业资讯 · australianmining.com.au

许可:负责人声明许可;来源异议或指示可逐项收紧

原始来源可追溯;中文内容由 AI 辅助生成或翻译,核对细节请看原文。

内容有误?告诉我们

事件后续

查看完整事件

更多操作