K92 Mining 公布 Arakompa 第六批钻探结果,AR1 高品位带大幅扩展

K92 Mining Announces Major Expansion of Arakompa AR1 High-Grade Zone and Delineation of Substantial Near-Surface High-Grade Bulk Tonnage Zone

Public on this site

AI summary

K92 Mining 公布其位于巴布亚新几内亚 Kainantu 金矿附近 Arakompa 的首个地表金刚石钻探计划第六批结果,共 33 个钻孔,累计已发布 100 个孔,全部见矿,其中 40 个交叉段超过 5 g/t AuEq、20 个超过 10 g/t AuEq。

Why it matters

原文披露了 Arakompa 第六批 33 个钻孔的品位与见矿厚度,可据此了解该项目迈向首次资源量估算的进展。

Text · AI translation

The translation is incomplete; switch to the original for the full text.

不列颠哥伦比亚省温哥华,2026年6月4日(GLOBE NEWSWIRE)——K92 Mining Inc.(“K92”或“公司”)(TSX: KNT;OTCQX: KNTNF)欣然宣布其第六批钻探结果,共33个钻孔,使其位于巴布亚新几内亚Kainantu金矿选矿厂约4.5公里处的Arakompa首次地表金刚石钻探计划迄今已公布的总钻孔数达到100个。Arakompa的所有钻孔均见矿化,其中40个见矿段超过5克/吨金当量,20个见矿段超过10克/吨金当量。

AR1 高品位矿带大幅扩展,钻探密度提高证实矿脉连续性良好

  • Arakompa 的 AR1 矿脉记录到多个高品位见矿段,钻探密度增加使近地表厚大高品位矿带扩大并升级,该矿带目前圈定至约 300 米垂深、走向长度达 400 米,自 100 米深度起算。地表填图和多个高品位岩屑样品表明,在厚大高品位矿带的上倾方向,矿化延伸至地表,因此除我们的外推钻探计划外,对上部 100 米进行加密钻探是优先目标。在该矿带内(见图 3),加权平均品位和平均真厚度分别为 9.47 克/吨金当量和 4.32 米。亮点包括:
    • KARDD0076:11.90 米,品位 14.30 克/吨金当量(14.00 克/吨金、9 克/吨银、0.18% 铜),其中包括
      1.70 米,品位 92.43 克/吨金当量(91.55 克/吨金、44 克/吨银、0.35% 铜)
    • KARDD0106:10.00 米,品位 15.21 克/吨金当量(15.11 克/吨金、4 克/吨银、0.06% 铜),其中包括
      4.00 米,品位 36.65 克/吨金当量(36.50 克/吨金、6 克/吨银、0.09% 铜)
    • KARDD0100: 16.50 米,品位 8.06 克/吨金当量 (7.53 克/吨金、8 克/吨银、0.43% 铜),其中包括
      3.00 米,品位 18.03 克/吨金当量(17.23 克/吨金、14 克/吨银、0.63% 铜)
    • KARDD0090: 8.60 米,品位 6.79 克/吨金当量(6.40 克/吨金、8 克/吨银、0.29% 铜) 
    • KARDD0094: 7.88 米,品位 6.63 克/吨金当量(5.60 克/吨金、22 克/吨银、0.77% 铜),其中包括
      2.15 米,品位 13.54 克/吨金当量(12.92 克/吨金、17 克/吨银、0.41% 铜) 
    • KARDD0091:4.00 米,品位 13.90 克/吨金当量(13.21 克/吨金、26 克/吨银、0.38% 铜),其中包括
      1.80 米,品位 30.35 克/吨金当量(28.84 克/吨金、57 克/吨银、0.83% 铜) 
    • KARDD0078: 5.10 米,品位 6.81 克/吨金当量(6.56 克/吨金、16 克/吨银、0.07% 铜)

AR2 矿脉实现多个高品位见矿段

  • Arakompa 的 AR2 矿脉记录到多个高品位见矿段,包括:

    • KARDD0084G:4.70 米,品位 41.90 克/吨金当量(41.46 克/吨金、4 克/吨银、0.38% 铜) 
    • KARDD0104:6.80 米,品位 15.21 克/吨金当量(15.11 克/吨金、6 克/吨银、0.04% 铜),其中包括
      2.00 米,品位 49.00 克/吨金当量(48.79 克/吨金、14 克/吨银、0.04% 铜)   
    • KARDD0090:3.40 米,品位 20.31 克/吨金当量(20.21 克/吨金、5 克/吨银、0.03% 铜),其中包括
      0.90 米,品位 71.63 克/吨金当量(71.40 克/吨金、16 克/吨银、0.04% 铜)
    • KARDD0073:8.00 米,品位 6.72 克/吨金当量(5.78 克/吨金、46 克/吨银、0.39% 铜) 
    • KARDD0105:3.60 米,品位 5.02 克/吨金当量(3.45 克/吨金、56 克/吨银、0.91% 铜)
    • KARDD0091:1.40 米,品位 7.51 克/吨金当量(6.12 克/吨金、55 克/吨银、0.73% 铜)

近地表大型高品位矿体带得到确认并扩大

  • 已记录多个近地表高品位厚大矿段,将高品位带向地表扩展,该区域此前因钻探不足而被解释为较低品位(见图5)。亮点包括:
    • KARDD0091:49.30米,品位1.95克/吨金当量(1.79克/吨金、7克/吨银、0.08%铜)
    • KARDD0106:140.10米,品位1.27克/吨金当量(1.21克/吨金、2克/吨银、0.03%铜)
    • KARDD0091和KARDD0106均位于此前报告的005AD92孔约60米处,该孔记录41.9米,品位2.21克/吨金当量(2.12克/吨金、2克/吨银、0.04%铜)。
  • 厚层高品位矿体带在多个方向扩展,钻探密度增加提高了对地质连续性的信心,并凸显了通过加密钻探和外围钻探提升Arakompa品位剖面升级的潜力(见图5)。该区域一直是Arakompa首次资源量估算之前的主要钻探重点。此外,地表采样表明,矿化沿Arakompa已知的+2公里走向长度延伸至地表,凸显了除外围钻探外,在迄今已圈定的高品位矿带上倾方向进行加密钻探的多个高优先级区域。亮点包括:
    • KARDD0076:99.00米,品位2.90克/吨金当量(2.76克/吨金,4克/吨银,0.09%铜)
    • KARDD0084G:105.40米,品位2.26克/吨金当量(2.17克/吨金,2克/吨银,0.06%铜)
    • KARDD0090:106.50米,品位2.22克/吨金当量(2.11克/吨金,3克/吨银,0.07%铜)
    • KARDD0078:70.90米,品位1.01克/吨金当量(0.89克/吨金,4克/吨银,0.07%铜),以及36.40米,品位1.00克/吨金当量(0.83克/吨金,3克/吨银,0.13%铜)
    • KARDD0094:137.35米,品位1.07克/吨金当量(0.95克/吨金,3克/吨银,0.08%铜)
    • KARDD0104:163.50米,品位1.02克/吨金当量(0.97克/吨金,2克/吨银,0.03%铜)
    • KARDD0100:177.55米,品位1.01克/吨金当量(0.90克/吨金,2克/吨银,0.08%铜)
    • KARDD0075:77.20米,品位1.01克/吨金当量(0.85克/吨金,5克/吨银,0.11%铜)
    • KARDD0086:43.80米,品位1.01克/吨金当量(0.88克/吨金,3克/吨银,0.10%铜)
    • KARDD0099:40.50米,品位1.03克/吨金当量(0.98克/吨金,2克/吨银,0.02%铜)

斑岩矢量钻探取得进展,触及外部钾化带

  • 继此前报道的 KARDD0065 发现孔之后,斑岩矿化矢量钻探取得进展,KARDD0077 完成了约 250 米的南向延伸。最新钻探结果进入并穿出外钾化蚀变带区间,为指向潜在高品位钾化核心提供了重要矢量。目前正调配第二台钻机以斑岩体为目标,即将开始钻探。亮点包括:
    • KARDD0077:1,151.20 米,品位 0.30% 铜当量(0.11 克/吨金、2 克/吨银、0.16% 铜)
    • KARDD0093G:800.70 米,品位 0.33% 铜当量(0.14 克/吨金、1 克/吨银、0.17% 铜)
    • KARDD0074:494.00 米,品位 0.35% 铜当量(0.15 克/吨金、2 克/吨银、0.17% 铜)
    • KARDD0065(此前已报道):690.40 米,品位 0.30% 铜当量(0.17 克/吨金、2 克/吨银、0.17% 铜)

注:
(1) 上文所列钻探亮点为核心长度(非真厚度)。
(2) 金当量(AuEq)和铜当量(CuEq)勘探结果采用长期商品价格计算,其中铜价为5.00美元/磅、银价为50.00美元/盎司、金价为3,500美元/盎司。 对于AuEq,按照更新后的最终可行性研究采用了以下回收率:Au – 92.6%、Cu – 94.0%、Ag – 78.0%。对于CuEq,未考虑冶金回收率和冶炼厂净收益。

K92首席执行官兼董事John Lewins表示,“Arakompa的最新结果代表着在推进该发现走向计划于2026年中期完成的首次资源估算方面又迈出了重要一步。钻探继续揭示出一个大型的近地表矿化系统,其亮点是AR1高品位矿带的显著扩大和连续性改善,以及一个规模可观的高品位大吨位矿带的圈定。钻探密度的增加正在增强我们的地质信心,同时也凸显了通过持续加密钻探和外围钻探提升品位特征的潜力。重要的是,地表采样表明矿化沿Arakompa已知的+2公里走向长度延伸至地表,进一步印证了仍存在的重大勘探上行空间。斑岩指向性钻探也在继续推进,最新结果为指向潜在高品位钾化核提供了重要指向。Arakompa正日益成为近年来Kainantu地区最重要的勘探成功案例之一,我们期待随着钻探的继续提供更多最新进展。”

K92勘探副总裁Robert Smillie表示:“最新结果继续印证了Arakompa为何成为我们勘探工作的重点,每一阶段的钻探都揭示出新的增长机遇。在我们推进至首次矿产资源估算的过程中,钻探持续展现出该系统的规模以及整个走廊范围内仍然存在的重大勘探上行空间。此外,最新结果中一个令人振奋的方面是,南部存在潜在斑岩系统的证据日益增多,这可能代表该地区内一个重要的新勘探机会。我们对最新钻探结果感到振奋,这些结果为指向潜在高品位斑岩核心提供了宝贵的矢量信息。”

数据

  • Arakompa 的平面图见图 1。
  • 图2提供了Arakompa的KARDD0076、KARDD0078、KARDD0084G和KARDD0090的横截面。
  • AR1 和 AR2 矿脉的长剖面分别展示了最新钻孔的位置,见 图 3 和图 4。 
  • 图5中提供了显示Arakompa矿体厚大见矿段及克米等值线的长剖面图。 
  • 区域位置图见 图 6。 
  • 钻孔KARDD0090、KARDD0084G和KARDD0106的岩心照片分别见图7、图8和图9。

表 1
Arakompa 金刚石钻探的重要见矿段

钻孔编号自
(m)
至
(m)
区间
(m)
真厚度
(m)
金
(g/t)
银
(g/t)
铜
(%)
金当量
(g/t)
矿脉
KARDD0068437.60458.7021.1014.770.8730.121.03整体矿化段
KARDD0068211.60212.601.000.704.90170.055.16 
KARDD0068414.20414.800.600.422.3290.212.64AR1
KARDD0068448.00449.301.300.913.5220.063.60 
KARDD0068457.90458.700.800.5611.73391.7013.88 
KARDD0069467.00483.0016.0012.161.0030.031.07整体矿段
KARDD0069218.70220.201.501.143.3010.023.33 
KARDD0069366.80368.201.401.061.2350.021.31AR2
KARDD0069391.00392.001.000.761.2180.021.32AR1
KARDD0069467.00470.103.102.364.75120.094.99 
KARDD0070455.50466.0010.508.401.0010.121.13整体矿段
KARDD0070455.50457.802.301.843.2720.313.60AR2
KARDD0070487.60490.402.802.240.9420.111.07AR1
KARDD0070527.00529.002.001.601.6410.031.68 
KARDD0071470.00481.6011.609.280.47160.341.00整体矿段
KARDD0071389.30390.901.601.280.90110.071.10AR1
KARDD0071470.90475.504.603.680.87390.792.13 
KARDD0072492.80515.8023.0015.870.8060.161.04整体矿段
KARDD0072382.60383.901.300.901.1350.031.22AR2
KARDD0072435.80438.602.801.932.58400.153.21 
KARDD0072477.60479.902.301.591.4150.201.67AR1
KARDD0072507.30510.903.602.481.9160.082.06 
KARDD0072514.20515.801.601.103.51261.124.94 
KARDD0073247.00303.0056.0039.200.8680.061.02整体矿段
KARDD0073247.00255.008.005.605.78460.396.72AR2
KARDD0073377.40380.002.601.821.93140.152.25 
KARDD0074358.00852.00494.00464.340.1520.170.35% CuEq斑岩型整体矿化段
KARDD0074358.00477.80119.8091.050.1420.160.32整体矿化段
KARDD0075442.20519.4077.2054.040.8550.111.01整体矿段
KARDD0075377.30378.401.100.772.0520.032.11AR2
KARDD0075471.30476.305.003.502.2940.252.59AR1
KARDD0075493.00503.2010.207.143.4720.083.57 
KARDD0075508.20519.4011.207.840.50200.301.05 
KARDD007690.70189.7099.0068.312.7640.092.90整体矿段
KARDD007690.7093.302.601.791.7340.021.79 
KARDD007695.80100.504.703.246.7580.076.92 
KARDD0076120.00124.004.002.763.33100.323.76AR2
KARDD0076134.40138.003.602.486.37120.156.67 
KARDD0076144.60156.5011.908.2114.0090.1814.30AR1
包括145.30147.001.701.1791.55440.3592.43AR1
KARDD0076166.10174.007.905.452.0680.202.35 
KARDD0077289.001440.201151.201102.580.1120.160.30% CuEq斑岩型整体矿化段
KARDD0077523.60636.20112.6084.450.1930.180.40整体矿化段
KARDD0077481.60482.300.700.530.4450.631.12AR2
KARDD0077552.80554.001.200.900.4420.500.96AR1
KARDD0077628.50633.505.003.750.97330.381.74 
KARDD0078119.70156.1036.4025.480.8330.131.00整体矿段
KARDD0078175.10246.0070.9049.630.8940.071.01整体矿段
KARDD0078203.90209.005.103.576.56160.076.81AR1
KARDD0078232.10238.906.804.762.08200.462.78 
KARDD0079386.00408.0022.0015.400.3230.030.38整体矿段
KARDD0079217.00218.201.200.840.82470.021.41AR2
KARDD0079255.00256.001.000.700.7720.020.81AR1
KARDD0080475.40501.9026.5018.550.7250.221.00整体矿段
KARDD0080585.50791.00205.50205.500.1510.170.34% CuEq厚大斑岩型交汇段
KARDD0080380.50382.001.501.051.96100.232.30AR2
KARDD0080426.25428.001.751.231.4510.131.59AR1
KARDD0080482.90484.201.300.919.24512.0211.86 
KARDD0080499.34499.900.560.397.03491.989.59 
KARDD0080552.20553.801.601.120.3810.480.87 
KARDD0081125.00148.2023.2016.241.3630.051.44 
KARDD0082472.00498.6026.6018.620.7350.221.01整体矿段
KARDD0082173.30180.807.505.250.9630.041.03 
KARDD0082308.60309.801.200.842.13391.243.83 
KARDD0082396.90398.101.200.841.4970.081.65AR2
KARDD0082431.00433.402.401.682.8180.343.25AR1
KARDD0082491.00492.401.400.989.77572.3012.74 
KARDD0082552.00554.002.001.400.5190.310.92 
KARDD0083209.90222.9013.0010.400.8130.151.00整体矿段
KARDD0083282.00308.0026.0020.801.0060.021.08整体矿段
KARDD0083177.60178.200.600.480.9340.161.14AR2
KARDD0083214.80217.803.002.402.78100.563.46AR1
KARDD0083304.90308.003.102.486.89360.047.35 
KARDD0084G258.60364.00105.4055.732.1720.062.26整体矿段
KARDD0084G7.909.401.500.815.0210.035.06 
KARDD0084G141.00142.101.100.592.46160.192.84 
KARDD0084G258.60260.001.400.760.9610.071.05 
KARDD0084G263.60268.304.702.5441.4640.3841.90AR2
包括265.40266.401.000.54163.44151.19164.80AR2
KARDD0084G315.30317.001.700.921.2890.161.54 
KARDD0084G342.20343.501.300.705.01210.085.34AR1
KARDD0084G358.60364.005.402.920.84100.181.14 
KARDD0086412.00455.8043.8035.480.8830.101.01整体矿段
KARDD0086347.30351.003.703.001.7620.001.79AR2
KARDD0086425.00431.706.705.431.0620.131.21AR1
KARDD0086445.50447.502.001.627.4880.247.82 
KARDD0086449.40452.603.202.592.84110.343.30 
KARDD0087281.60421.40139.80102.050.1320.020.17整体矿段
KARDD0087122.00123.001.000.730.52190.140.88 
KARDD0087281.60282.701.100.800.77280.011.11AR2
KARDD0087319.90320.300.400.291.18100.071.37AR1
KARDD0087418.90421.402.501.832.10270.222.64 
KARDD0087457.50458.501.000.731.4150.742.21 
KARDD0088250.70350.2099.5052.740.2830.050.36整体矿化段
KARDD00884.009.905.903.132.5230.032.58 
KARDD008821.0023.002.001.063.0410.013.06 
KARDD0088262.00263.901.901.013.1820.053.25AR2
KARDD0088340.40344.404.002.120.94170.181.32AR1
KARDD0088349.00350.201.200.641.7430.141.93 
KARDD0089345.00364.0019.0015.770.9150.051.02整体矿段
KARDD0089233.40235.702.301.910.96150.281.41AR2
KARDD0089240.90242.301.401.160.8630.191.09AR1
KARDD0089352.40364.0011.609.631.3870.071.54 
包括352.40353.901.501.254.4580.024.56 
KARDD0090109.50216.00106.5082.012.1130.072.22整体矿段
KARDD00908.4010.402.001.5412.8810.0212.92 
KARDD0090111.80115.003.202.469.2250.089.37 
KARDD0090123.00128.005.003.855.3530.035.41 
KARDD0090153.00156.403.402.6220.2150.0320.31AR2
包括153.70154.600.900.6971.40160.0471.63AR2
KARDD0090162.50165.903.402.621.5160.031.62 
KARDD0090172.70175.903.202.463.62240.514.42 
KARDD0090203.40212.008.606.626.4080.296.79AR1
KARDD0090214.30216.001.701.311.4120.031.46 
KARDD0091104.80154.1049.3032.541.7970.081.95整体矿段
KARDD009160.6061.500.900.591.54250.312.15 
KARDD009163.6065.902.301.524.6870.124.89 
KARDD0091104.80108.603.802.515.23260.105.65 
KARDD0091112.00116.004.002.6413.21260.3813.90AR1
包括112.00113.801.801.1928.84570.8330.35AR1
KARDD0091152.70154.101.400.926.12550.737.51AR2
KARDD0093G261.701062.40800.70800.700.1410.170.33% CuEq斑岩型整体矿化段
包括753.001062.40309.40309.400.1920.190.40% CuEq斑岩型整体矿化段
KARDD0094160.40297.75137.35101.640.9530.081.07整体矿化段
KARDD0094187.50193.205.704.221.5710.021.61 
KARDD0094199.00203.024.022.971.9920.022.03 
KARDD0094213.00217.104.103.032.5520.042.60AR2
KARDD0094232.00237.005.003.702.2030.152.39 
KARDD0094238.92246.807.885.835.60220.776.63AR1
包括239.25241.402.151.5912.92170.4113.54AR1
KARDD0094269.00274.005.003.702.2940.132.47 
KARDD0094276.00280.534.533.350.88100.111.11 
KARDD009568.00100.3032.3020.350.3620.030.41整体矿段
KARDD009578.2079.401.200.763.35170.263.82AR1
KARDD009595.9098.002.101.321.3830.031.45AR2
KARDD0096103.00224.00121.0060.500.4930.050.57整体矿段
KARDD0096103.00130.0027.0013.500.8230.030.89 AR1
KARDD0096158.00173.5015.507.750.6050.070.72 
KARDD0096211.60224.0012.406.200.7810.020.82AR2 
KARDD0099207.50248.0040.5026.730.9820.021.03整体矿段
KARDD0099207.50210.002.501.6513.2260.0313.33 
KARDD0099232.70233.000.300.203.64460.104.29AR2
KARDD0099288.00289.001.000.660.9730.111.11 
KARDD0099297.40303.205.803.830.7140.160.91AR1
KARDD0099315.80319.703.902.570.8820.141.05 
KARDD0100121.45299.00177.5588.780.9020.081.01整体矿段
KARDD0100125.70128.602.901.454.60110.435.17 
KARDD0100139.00144.005.002.501.0590.381.54 
KARDD0100146.00162.5016.508.257.5380.438.06AR1
包括155.70158.703.001.5017.23140.6318.03AR1
KARDD0100373.70376.002.301.151.0720.181.27AR2
KARDD0101275.80351.0075.2056.400.1530.020.20整体矿段
KARDD0101286.20289.403.202.401.7290.101.93AR2
KARDD0101302.20303.000.800.603.03400.213.72 
KARDD0101325.00330.785.784.340.2510.050.32 
KARDD0101423.50424.501.000.750.5680.371.03 
KARDD0104120.00283.50163.50114.450.9720.031.02Bulk Intersection
KARDD0104120.80123.002.201.546.8920.026.92 
KARDD0104137.00139.002.001.401.8810.011.90 
KARDD0104179.00185.806.804.7615.1160.0415.21AR2
including179.00181.002.001.4048.79140.0449.00AR2
KARDD0104261.00263.002.001.400.7820.130.93AR1
KARDD0104271.60274.102.501.750.8550.111.02 
KARDD0104301.00302.201.200.8418.66530.5319.82 
KARDD010558.4091.6033.2022.240.8070.161.04Bulk Intersection
KARDD010568.9078.809.906.631.1320.121.27AR1
KARDD010585.0088.603.602.413.45560.915.02AR2
KARDD010624.00164.10140.1084.061.2120.031.27Bulk Intersection
KARDD010624.0025.101.100.660.27460.140.97 
KARDD010692.3096.003.702.221.4980.131.71 
KARDD0106102.00112.0010.006.0015.1140.0615.21AR1
including102.00106.004.002.4036.5060.0936.65AR1
KARDD0106138.00140.002.001.200.8810.030.92AR2


Table 2

Collar Locations for Arakompa Surface Drilling

Hole IDCollar location Collar orientation
Local
North
Local EastmRLDipLocal
azimuth
EOH depth
(m)
KARDD006869778894591554-4973471
KARDD006969738902291386-56103506
KARDD007069721897381463-4853539
KARDD007169737902321386-5452527
KARDD007269778894591554-4954600
KARDD007369837902901411-5148508
KARDD007469778892631555-4792872
KARDD007569778894591554-4859609
KARDD007669922897311460-4690223
KARDD007769723891161559-48931492
KARDD007869925897331464-6181313
KARDD007969837902881412-6187411
KARDD008069777892641555-4661800
KARDD008169922897321459-6080165
KARDD008269779894571554-5791570
KARDD008369837902881411-4786406
KARDD0084G69925897331464-5828503
KARDD008669779894601554-4357562
KARDD008769837902891411-6662558
KARDD008869921897331459-6642356
KARDD008969837902891411-5466374
KARDD009069925897331460-4753239
KARDD009170069895761535-45210165
KARDD0093G69779892621555-581701062
KARDD009469921897331460-5847326
KARDD009570060895721530-48290215
KARDD009670061895721530-65283347
KARDD009969921897331460-6040354
KARDD010070069895761535-71296415
KARDD010169845902911411-6339505
KARDD010469925897331460-6157308
KARDD010570069895761535-46249217
KARDD010670062895701531-62240278


Drill Hole Sampling Methodology, QA/QC and Qualified Person

The diamond drill hole is first logged to determine the sampling intervals, which range from a minimum of 0.1 m to generally 1 m. The drill core is sawn half core cut along a reference line, with the remainder of the core returned to the core tray. Core samples are then placed in numbered calico and plastic bags, with a numbered sample ticket for dispatch to the assay laboratory. Samples are separately assayed for gold, copper and silver. K92’s procedure includes the insertion of standards, blanks and duplicates. Gold assays are by the fire assay method. Copper and silver assays are by the three-acid-digestion method (nitric, perchloric and hydrochloric mix).

K92 maintains an industry-standard analytical quality assurance and quality control (QA/QC) and data verification program to monitor laboratory performance and ensure high quality assays. Results from this program confirm reliability of the assay results. All sampling and analytical work for the mine exploration program is performed by Intertek Testing Services (PNG) Ltd, an independent accredited laboratory that is located on site. External check assays for QA/QC purposes are performed at SGS Australia Pty Ltd in Townsville, Queensland, Australia.

K92 Mining Chief Geologist, Andrew Kohler, PGeo, MAIG, Qualified Person under the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has approved the technical content of this news release. In addition to the analytical QA/QC program outlined above, data verification also includes significant time onsite reviewing drill core, soil and outcrop sampling, artisanal workings, as well as discussing work programs and results with geology personnel and external consultants.

About K92

K92 Mining Inc. is engaged in the production of gold, copper and silver at the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as exploration and development of mineral deposits in the immediate vicinity of the mine. The Company declared commercial production from Kainantu in February 2018, is in a strong financial position, and is working to become a Tier 1 mid-tier producer through ongoing plant expansions. A maiden resource estimate on the Blue Lake copper-gold porphyry project was completed in August 2022. K92 is operated by a team of mining company professionals with extensive international mine-building and operational experience.

On Behalf of the Company,

John Lewins, Chief Executive Officer and Director

For further information, please contact David Medilek, P.Eng., CFA, President and Chief Operating Officer at +1-604-416-4445

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements include, without limitation: (i) the expansion of the high-grade zones at the Arakompa project; (ii) statements regarding the delineation of a high-grade bulk tonnage zone; (iii) statements regarding a possible mineral resource estimate at the Arakompa project; (iv) statements regarding future drilling and potential results; (v) the geological potential of the Arakompa project; and (vi) the potential extended life of the Kainantu Mine.

All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors, many of which are beyond our ability to control, that may cause our actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, without limitation, Public Health Crises, including the epidemic or pandemic viruses; changes in the price of gold, silver, copper and other metals in the world markets; fluctuations in the price and availability of infrastructure and energy and other commodities; fluctuations in foreign currency exchange rates; volatility in price of our common shares; inherent risks associated with the mining industry, including problems related to weather and climate in remote areas in which certain of the Company’s operations are located; failure to achieve production, cost and other estimates; risks and uncertainties associated with exploration and development; uncertainties relating to estimates of mineral resources including uncertainty that mineral resources may never be converted into mineral reserves; the Company’s ability to carry on current and future operations, including development and exploration activities at the Arakompa, Kora, Judd and other projects; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the availability and costs of achieving the Stage 3 Expansion or the Stage 4 Expansion; the ability of the Company to achieve the inputs the price and market for outputs, including gold, silver and copper; failures of information systems or information security threats; political, economic and other risks associated with the Company’s foreign operations; geopolitical events and other uncertainties, such as the conflicts in Ukraine, Israel and Palestine; compliance with various laws and regulatory requirements to which the Company is subject to, including taxation; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions, including relationship with the communities in Papua New Guinea and other jurisdictions it operates; other assumptions and factors generally associated with the mining industry; and the risks, uncertainties and other factors referred to in the Company’s Annual Information Form under the heading “Risk Factors”.

Estimates of mineral resources are also forward-looking statements because they constitute projections, based on certain estimates and assumptions, regarding the amount of minerals that may be encountered in the future and/or the anticipated economics of production. The estimation of mineral resources and mineral reserves is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, Forward-looking statements are not a guarantee of future performance, and actual results and future events could materially differ from those anticipated in such statements. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking statements, there may be other factors that cause actual results to differ materially from those that are anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

Figure 1 – Arakompa Plan Map

查看配图:image2.png

Figure 2 – Arakompa Cross-Section – Showing KARDD0076, KARDD0078, KARDD0084G, and KARDD0090

查看配图:image3.png

Figure 3 – AR1 Vein Long Section

查看配图:image4.png

Figure 4 – AR2 Vein Long Section

查看配图:image5.png

Figure 5 – Arakompa Bulk Interpretation Long Section

查看配图:image6.png

Figure 6 – Site Map and Location of Arakompa

查看配图:image7.png

Figure 7 – KARDD0090 Core Photograph, 153.0 – 156.3m; within intersection of 3.4m at 20.31 g/t AuEq (AR2 Vein), including 0.9m at 71.63 g/t AuEq, within a broader bulk intercept of 106.5m at 2.22 g/t AuEq.

查看配图:image8.png

Figure 8 – KARDD0084G Core Photograph, 262.6 – 267.6m; within intersection of 4.7m at 41.90 g/t AuEq (AR2 Vein), including 1.0m at 164.80 g/t AuEq, within a broader bulk intercept of 105.4m at 2.26 g/t AuEq.

查看配图:image9.png

Figure 9 – KARDD0106 Core Photograph, 104.1 – 108.7m; within intersection of 10.0m at 15.21 g/t AuEq (AR1 Vein), including 4.0m at 36.65 g/t AuEq, within a broader bulk intercept of 140.1m at 1.27 g/t AuEq.

查看配图:image10.jpeg

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/39ec55b5-b1be-434f-90ce-4764250d9e94

https://www.globenewswire.com/NewsRoom/AttachmentNg/7c69ce85-44b6-44b9-bee7-7c93db20196f

https://www.globenewswire.com/NewsRoom/AttachmentNg/45c0fc83-f47b-433d-8ac9-ba9899659c45

https://www.globenewswire.com/NewsRoom/AttachmentNg/a536a8a0-f054-4fc4-bfda-4ae856a81033

https://www.globenewswire.com/NewsRoom/AttachmentNg/6ba65808-0eec-4d63-96e3-73d37100dd0d

https://www.globenewswire.com/NewsRoom/AttachmentNg/2c01774a-a3fa-44f9-83ff-1d939257c74c

https://www.globenewswire.com/NewsRoom/AttachmentNg/8fa9fcc4-49f4-4525-9ef2-7abbfdc8c9d4

https://www.globenewswire.com/NewsRoom/AttachmentNg/1dcdca5e-ee91-4bd4-a667-9675cacc82e9

https://www.globenewswire.com/NewsRoom/AttachmentNg/530d0242-5dc6-4cc4-8acd-26cbf9c17b1a

查看配图

https://www.globenewswire.com/NewsRoom/AttachmentNg/b777f2ea-6c46-42ed-a4b8-0567039a812d 查看配图:Primary Logo

查看配图:info?story_id=7778743692816767&vendor_id=83c8871

Source: K92 Mining · 官方动态 · k92mining.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

More actions