The Chinese translation is being made; the original is shown for now.
Capstone Copper因Pinto Valley重启推迟下调铜产量指引
Capstone cuts copper outlook as restart slips
Public on this site
Capstone Copper(TSX: CS;ASX: CSC)将年度铜产量指引下限下调5,000吨至195,000吨,因美国亚利桑那州Pinto Valley矿全面重启推迟至12月中旬。初碎机主要机械部件需由原设备制造商在厂外制造更换,移动破碎机预计11月中旬恢复部分处理。公司同时面临智利全国卡车司机罢工对精矿、阴极铜发运及燃料、硫酸供应的威胁。
Source: MINING.COM · mining.com
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Related coverage
Representative reportReading now
Capstone Copper因Pinto Valley重启推迟下调铜产量指引MINING.COM · 2026-11-14 06:36
Capstone Copper(TSX: CS;ASX: CSC)将年度铜产量指引下限下调5,000吨至195,000吨,因美国亚利桑那州Pinto Valley矿全面重启推迟至12月中旬。初碎机主要机械部件需由原设备制造商在厂外制造更换,移动破碎机预计11月中旬恢复部分处理。公司同时面临智利全国卡车司机罢工对精矿、阴极铜发运及燃料、硫酸供应的威胁。
LatestReading now
Capstone Copper因Pinto Valley重启推迟下调铜产量指引MINING.COM · 2026-11-14 06:36
Capstone Copper(TSX: CS;ASX: CSC)将年度铜产量指引下限下调5,000吨至195,000吨,因美国亚利桑那州Pinto Valley矿全面重启推迟至12月中旬。初碎机主要机械部件需由原设备制造商在厂外制造更换,移动破碎机预计11月中旬恢复部分处理。公司同时面临智利全国卡车司机罢工对精矿、阴极铜发运及燃料、硫酸供应的威胁。