Text · AI translation
The translation is incomplete; switch to the original for the full text.
Silverco Mining Ships First Cusi Concentrate, Provides Cusi Restart Update
Public on this site
Silverco Mining(Silverco Mining Ltd.)已从墨西哥奇瓦瓦州全资拥有的 Cusi 项目发运首批精矿,重启资本支出保持在预算内、进度符合计划。Mal Paso 选厂干试车已完成、湿试车基本完成,计划11月底全面移交,尾矿浓密机将于2027年1月安装完成。公司计划在2027年上半年将 Cusi 产能提升至1200吨/日,并与 La Negra 合计在2027年实现超过400万盎司银当量产量。
The translation is incomplete; switch to the original for the full text.
Source: Investing News Network · 资源板块 · investingnews.com
Licence: 负责人声明许可;来源异议或指示可逐项收紧
The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.
Something wrong? Tell us