Skip to content
Aurania Resources · 官方动态· Carolyn Muir·· 5 d agoAI score37.0

Aurania在冰岛Thormódsdalur金矿首轮钻探见10.10 g/t金矿化4.15米

Aurania Intersects 10.10 g/t Gold Over 4.15 Metres in Initial Drill Results from the Thormodsdalur Gold Project in Iceland

Public on this site

AI summary

Aurania Resources公布冰岛Thormódsdalur浅成低温热液金矿项目2026年首轮两个钻孔的初步化验结果,TARU2026-05孔自20.85米见10.10 g/t金、矿化厚度4.15米,其中含15.31 g/t金、2.40米。TARU2026-04孔见两个含金带,分别为3.13 g/t金、2.50米和2.05 g/t金、4.30米。本次岩芯采取率平均98%,远高于历史钻探约50%或更低;另有六个钻孔化验待公布,项目尚未估算资源量。

Text · AI translation

The translation is incomplete; switch to the original for the full text.

Source: Aurania Resources · 官方动态 · aurania.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

More actions