Skip to content
MINING.COM· Marina Meireles·· 27 d agoAI score65.0

Eldorado Gold旗下Skouries铜金矿获欧盟战略项目地位

Eldorado’s Skouries mine wins EU strategic status

Public on this site Time not recorded

AI summary

欧盟委员会授予Eldorado Gold(TSX: ELD,NYSE: EGO)位于希腊的Skouries铜金矿战略项目地位,该项目由此进入欧盟《关键原材料法案》(CRMA)选定的46个项目名单,可加快许可审批并更便利地争取公共和私人融资,但不会立即获得欧盟委员会的资金。

The European Commission has granted strategic status to Eldorado Gold’s (TSX: ELD, NYSE: EGO) Skouries copper-gold mine in Greece, positioning one of Europe’s largest new mining projects for faster permitting and improved access to financing as it ramps up production. 

The designation, the Canadian miner announced on Oct. 9, places Skouries among 46 projects selected under the EU’s Critical Raw Materials Act (CRMA). 

The backing comes as the EU looks to strengthen its domestic supply chain of critical metals and enhance long-term supply, breaking free from its reliance on China for them. Copper is included in the list as it is essential for Europe’s electrification, manufacturing, and the energy transition.  

“As one of the largest new copper-gold mines in Europe, Skouries is positioned to support the secure and responsible supply of critical raw materials that are essential to economic growth, industrial competitiveness and the energy transition,” Eldorado CEO Christian Milau said. “This recognition highlights the strategic significance of the project and the important role it can play in strengthening Europe’s long-term supply chain resilience.” 

Skouries is among 46 projects selected by the EU that will benefit from faster permitting and help in bidding for public and private funding, not immediately receiving funding from the Commission.  

Shares in Eldorado Gold were down 3.03% to C$52.09 ($36.62) apiece on Tuesday morning in Toronto, valuing the company at C$13.6 billion ($9.5 billion). 

European Commission picks 46 new strategic critical mineral projects

Taking off  

Located in the Halkidiki region of northern Greece, the mine represents more than $2 billion in investment and is designed to operate for 20 years, supporting jobs and economic activity in the region. 

Skouries recently produced its first copper-gold concentrate, looking to start commercial production by the end of 2026. The ore stockpile now exceeds 4.6 million tonnes, enough to support more than seven months of planned processing throughput.  

Eldorado’s Skouries turns years of setbacks into copper

The project has endured a lengthy and difficult development history. Construction was suspended for four years between 2017 and 2021 amid permitting delays and local opposition in its early days due to the environmental impact the project could have in the region.  

Eldorado reached a revised investment agreement with the Greek government in 2021 before its board approved restarting the project in 2022. 

Skouries aim to produce about 140,000 oz. of gold and 67 million lb. of copper annually from open-pit and underground operations.  

Source: MINING.COM · mining.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Related coverage

Representative report

埃尔多拉多黄金公司希腊斯科里斯铜金矿获欧盟战略项目地位

上海有色网 SMM · 行业资讯 · 2026-10-19 08:57

欧盟委员会授予埃尔多拉多黄金公司希腊斯科里斯铜金矿战略地位,该项目是依据《欧盟关键原材料法案》筛选的46个项目之一,可享受加快审批和融资便利,但不意味着能直接从欧盟委员会获得资金。斯科里斯投资超过20亿美元,设计运营20年,最近已产出首批铜金精矿,预计2026年底前正式投产,目前矿石库存超过460万吨。该矿目标年产金14万盎司、铜6700万磅。

Latest

埃尔多拉多黄金公司希腊斯科里斯铜金矿获欧盟战略项目地位

上海有色网 SMM · 行业资讯 · 2026-10-19 08:57

欧盟委员会授予埃尔多拉多黄金公司希腊斯科里斯铜金矿战略地位,该项目是依据《欧盟关键原材料法案》筛选的46个项目之一,可享受加快审批和融资便利,但不意味着能直接从欧盟委员会获得资金。斯科里斯投资超过20亿美元,设计运营20年,最近已产出首批铜金精矿,预计2026年底前正式投产,目前矿石库存超过460万吨。该矿目标年产金14万盎司、铜6700万磅。

Something wrong? Tell us

Event follow-ups

See the full event

More actions