Skip to content
Lundin Mining · 官方动态·PicksAI score60.0

Lundin Mining提交Vicuña项目NI 43-101矿产资源技术报告

Lundin Mining Files Vicuña Mineral Resource Technical Report

Public on this site

AI summary

Lundin Mining宣布已提交名为《NI 43-101 Technical Report on the Vicuña Project, Argentina and Chile》的技术报告,生效日期为2025年4月15日,报告中的矿产资源量估算与2025年5月4日新闻稿无重大差异。

Why it matters

原文给出Vicuña项目NI 43-101技术报告的编制方与生效日期,可据此了解该铜金银资源量披露的合规路径。

Text · AI translation

The translation is incomplete; switch to the original for the full text.

Lundin Mining提交Vicuña矿产资源技术报告


温哥华,不列颠哥伦比亚省,2025年6月16日 /CNW/ - (多伦多证券交易所:LUN)(纳斯达克斯德哥尔摩:LUMI)Lundin Mining Corporation(“Lundin Mining”或“公司”)宣布,继其2025年5月4日发布、公布Filo del Sol硫化物矿床初始矿产资源量估算、Filo del Sol氧化物矿床矿产资源量估算更新以及Josemaria矿床矿产资源量估算更新(统称“Vicuña矿产资源量”)的新闻稿之后,公司已提交一份题为“Vicuña项目NI 43-101技术报告,阿根廷和智利”的技术报告,生效日期为2025年4月15日(“技术报告”)。技术报告中报告的矿产资源量估算与2025年5月4日新闻稿中所载的矿产资源量估算不存在重大差异。

近期发布的 Vicuña 矿产资源量(见 2025年5月4日的新闻稿)凸显了全球最大的铜、金、银资源之一,其矿产资源量在全球最大产铜矿山中位列前10,并且是过去30年来最大的绿地铜矿发现1。

Vicuña Corp. 是 Lundin Mining 与必和必拓(BHP)各持股 50% 的合资安排(“合资安排”),持有 Filo del Sol 项目和 Josemaria 项目(合称“Vicuña”)。该合资安排建立了两家公司之间的长期战略联盟,以开发一个新兴的世界级铜、金、银矿区。Filo del Sol 与 Josemaria 项目相邻,构成 Vicuña 项目的基础,使联合开发成为可能,从而获得更大的规模经济、共享基础设施以及更高的分阶段扩建选择权,以支撑一个全球排名的采矿综合体。

The Technical Report was prepared by Luke Evans, M.Sc., P.Eng. of SLR Consulting (Canada) Ltd, Paul Daigle, P.Geo. of AGP Mining Consultants Inc., Sean Horan, P.Geo. of Resource Modeling Solutions Ltd., Jeffrey Austin, P.Eng. of International Metallurgical and Environmental Inc., and Bruno Borntraeger, P.Eng. of Knight Piésold Ltd, each of whom is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects(“NI 43-101”) and independent of Lundin Mining.

本技术报告依据加拿大证券管理机构的 NI 43-101 要求编制,可在公司 SEDAR+ 档案页面 www.sedarplus.ca 及公司网站 www.lundinmining.com 查阅。

1.  根据标普全球(S&P Global)的排名,包括Filo del Sol和Josemaria矿床。

关于Lundin Mining

Lundin Mining 是一家多元化基本金属矿业公司,在阿根廷、巴西、智利和美国拥有运营项目或项目,主要生产铜、黄金和镍。

前瞻性信息警示声明

本文中所作的部分陈述和所含信息构成适用的加拿大证券法意义上的“前瞻性信息”。除历史事实陈述外,本文档中包含的所有陈述均构成前瞻性信息,包括但不限于有关 Vicuña 矿产资源估算的陈述,包括与之相关的参数和假设;公司的计划、前景和业务战略;与必和必拓(BHP)共同运营 Vicuña;在 Vicuña 地区实现协同效应和规模经济;Vicuña 项目的开发和未来运营;未来研究的时间安排和预期;资源扩张的潜力;以及对其他经济、商业和/或竞争因素的预期。“相信”、“预期”、“预计”、“考虑”、“目标”、“计划”、“目的”、“旨在”、“打算”、“继续”、“预算”、“估计”、“可能”、“将”、“能够”、“可以”、“应当”、“时间表”等词语及类似表述均标识前瞻性信息。

Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, appropriate equipment and sufficient labour; assumed and future price of copper, zinc, nickel, gold and other metals; anticipated costs; currency exchange rates and interest rates; the ability to achieve goals and identify and realize opportunities; the prompt and effective integration of acquisitions;, the realization of synergies and economies of scale in connection with the establishment of the joint arrangement with BHP; that the political, economic, permitting and legal environment in which the Company operates will continue to support the development and operation of mining projects; timing and receipt of governmental, regulatory and third party approvals, consents, licenses and permits and their renewals; positive relations with local groups; the accuracy of Mineral Resource estimates and related information, analyses and interpretations; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management’s experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic, political, regulatory and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking information and undue reliance should not be placed on such information. Such factors include, but are not limited to: global financial conditions, market volatility and inflation, including pricing and availability of key supplies and services; risks inherent in mining including but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; project financing risks, liquidity risks and limited financial resources; volatility and fluctuations in metal and commodity demand and prices; delays or the inability to obtain, retain or comply with permits; significant reliance on assets in Chile; reputation risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; risks relating to the development of the Filo del Sol deposit and the Josemaria deposit; inability to attract and retain highly skilled employees; risks associated with climate change; compliance with environmental, health and safety laws and regulations; unavailable or inaccessible infrastructure, infrastructure failures, and risks related to ageing infrastructure; risks inherent in and/or associated with operating in foreign countries and emerging markets, including with respect to foreign exchange and capital controls; economic, political and social instability and mining regime changes in the Company’s operating jurisdictions, including but not limited to those related to permitting and approvals, nationalization or expropriation without fair compensation, environmental and tailings management, labour, trade relations, and transportation; risks relating to indebtedness; the inability to effectively compete in the industry; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration, including the joint acquisition of Filo Corp. and the joint arrangement with BHP; changing taxation regimes; risks related to mine closure activities, reclamation obligations, environmental liabilities and closed and historical sites; reliance on key personnel and reporting and oversight systems, as well as third parties and consultants in foreign jurisdictions; information technology and cybersecurity risks; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits including but not limited to models relating thereto; uncertainties relating to inferred Mineral Resources being converted into Measured or Indicated Mineral Resources; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; ore processing efficiency; community and stakeholder opposition; financial projections, including estimates of future expenditures and cash costs, and estimates of future production may not be reliable; enforcing legal rights in foreign jurisdictions; environmental and regulatory risks associated with the structural stability of waste rock dumps or tailings storage facilities; activist shareholders and proxy solicitation matters; risks relating to dilution; regulatory investigations, enforcement, sanctions and/or related or other litigation; risks relating to payment of dividends; counterparty and customer concentration risks; the estimation of asset carrying values; risks associated with the use of derivatives; risks relating to joint ventures, joint arrangements and operations; relationships with employees and contractors, and the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; conflicts of interest; existence of a significant shareholder; exchange rate fluctuations; challenges or defects in title; internal controls; compliance with foreign laws; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices, or human rights violations; the threat associated with outbreaks of viruses and infectious diseases; risks relating to minor elements contained in concentrate products; and other risks and uncertainties, including but not limited to those described in the “Risk and Uncertainties” section of the Company’s MD&A for the year ended December 31, 2024 and the “Risk and Uncertainties” section of the Company’s Annual Information Form for the year ended December 31, 2024, which are available on SEDAR+ at www.sedarplus.ca under the Company’s profile.

本文件中的所有前瞻性信息均受这些警示性声明的限定。尽管公司已尝试识别可能导致实际结果与前瞻性信息中所载结果存在重大差异的重要因素,但仍可能存在其他导致结果与预期、估计、预测或设想不符的因素,读者应注意上述清单并非可能已使用的全部因素和假设的详尽列表。若其中一项或多项风险与不确定性成为现实,或相关基础假设被证明不正确,实际结果可能与前瞻性信息中所述存在重大差异。因此,无法保证前瞻性信息将被证明准确,前瞻性信息亦不构成对未来业绩的保证。建议读者不要过度依赖前瞻性信息。本文件所载前瞻性信息仅截至本文件日期。除适用法律要求外,公司不打算亦无义务更新或修订前瞻–性信息,或解释该等信息与后续实际事件之间的任何重大差异。

Source: Lundin Mining · 官方动态 · lundinmining.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Something wrong? Tell us

Companies in this article

  • 必和必拓 (BHP)

    Vicuña Corp.为Lundin Mining与BHP各持50%的合资安排,持有Filo del Sol和Josemaria项目。

    Source of the data: 原文依据

More actions