Skip to content
MININGMETALnews · 行业资讯·AI score62.0

Perpetua Resources 在 Stibnite 项目 Fiddle 靶区发现新金矿化

Perpetua announces new gold discovery at its Stibnite project

Public on this site

AI summary

Perpetua Resources 公布 Stibnite 金矿项目 2026 年勘探钻探计划已完成逾 16,000 米岩心钻探,Fiddle 靶区首个钻孔 SB633 自孔深 189 米起见 109.7 米、金品位 3.2 g/t、锑品位 1.1% 的矿化,为公司迄今在 Stibnite 获得的最宽连续金锑矿化区间之一,品位超过项目全生命周期平均值的两倍。SB637 将矿化向北延伸 110 米,SB665 和 SB671 两个孔仍在等待化验结果;Clark Tunnel Fault Zone 的后续钻探继续显示近地表高品位,SB606 见 25.4 米、金品位 4.5 g/t,SB605 见 25.0 米、金品位 2.3 g/t,其锑和钨化验结果尚未出炉。

Text · original

The Chinese translation is being made; the original is shown for now.

Perpetua Resources has provided an update on exploration activities at the company's Stibnite Gold Project in central Idaho. 

The 2026 Exploration Drilling Program is now complete with over 16,000 meters of core drilling across the project. The program's objectives included upgrading in-pit and near-pit inferred resources, extending mineralization along strike, testing key underground targets, and following up on discoveries from the 2025-2026 drill program.

Initial assays from the Fiddle target returned 109.7 meters grading 3.2 g/t gold, 1.1% antimony in hole SB633, beginning at 189 meters downhole. SB633 represents one of the broadest continuous intervals of gold and antimony mineralization returned to date from Stibnite while also exhibiting grades more than double the Project's life-of-mine average. 

Additional assays came from 3 holes: SB637, which extended mineralization 110 meters to the north, and SB643 and SB646, which were drilled from a pad to the north of SB633. An additional 21 holes were drilled along strike of SB633. Two subsequent holes, SB665 and SB671, were drilled to the south and are awaiting assay. Core logging identified both holes as having similar style mineralization to hole SB633, including abundant stibnite and sulfides within the mineralized zones.

Follow-up drilling from the Clark Tunnel Fault Zone continued to demonstrate near-surface, high grades including 25.4 meters of 4.5 g/t gold from 13 meters downhole (SB606) and 25.0 meters of 2.3 g/t gold from 18 meters downhole (SB605). Antimony and tungsten assay results for these holes are currently pending.  

"Given their close proximity to the permitted Yellow Pine pit, Fiddle and the CTFZ were prioritized as key targets for the 2026 exploration program," said Jon Cherry, President and CEO of Perpetua Resources. "At Fiddle, our initial hole returned broad, continuous mineralization at significant gold and antimony grades which confirm it as an important new discovery. Meanwhile, drilling continues to reinforce the CTFZ as a near-surface, high-grade target on the eastern extent of the Yellow Pine pit. We're pleased with the results from our recent drilling which align with our objectives of expanding our currently defined resource base and extending our compelling production profile."

About Perpetua Resources and the Stibnite Gold Project

Perpetua Resources Corp., through its wholly owned subsidiaries, is focused on the exploration, site restoration, and redevelopment of gold-antimony-tungsten deposits in the Stibnite-Yellow Pine district of central Idaho. The Stibnite Gold Project is one of the highest-grade, open-pit gold deposits in the United States.

Source: MININGMETALnews · 行业资讯 · miningmetalnews.com

Licence: 负责人声明许可;来源异议或指示可逐项收紧

The original source is traceable; the Chinese content is written or translated with AI assistance ; check the original for details.

Related coverage

Representative reportReading now

Perpetua Resources 在 Stibnite 项目 Fiddle 靶区发现新金矿化

MININGMETALnews · 行业资讯 · 2026-11-05

Perpetua Resources 公布 Stibnite 金矿项目 2026 年勘探钻探计划已完成逾 16,000 米岩心钻探,Fiddle 靶区首个钻孔 SB633 自孔深 189 米起见 109.7 米、金品位 3.2 g/t、锑品位 1.1% 的矿化,为公司迄今在 Stibnite 获得的最宽连续金锑矿化区间之一,品位超过项目全生命周期平均值的两倍。SB637 将矿化向北延伸 110 米,SB665 和 SB671 两个孔仍在等待化验结果;Clark Tunnel Fault Zone 的后续钻探继续显示近地表高品位,SB606 见 25.4 米、金品位 4.5 g/t,SB605 见 25.0 米、金品位 2.3 g/t,其锑和钨化验结果尚未出炉。

LatestReading now

Perpetua Resources 在 Stibnite 项目 Fiddle 靶区发现新金矿化

MININGMETALnews · 行业资讯 · 2026-11-05

Perpetua Resources 公布 Stibnite 金矿项目 2026 年勘探钻探计划已完成逾 16,000 米岩心钻探,Fiddle 靶区首个钻孔 SB633 自孔深 189 米起见 109.7 米、金品位 3.2 g/t、锑品位 1.1% 的矿化,为公司迄今在 Stibnite 获得的最宽连续金锑矿化区间之一,品位超过项目全生命周期平均值的两倍。SB637 将矿化向北延伸 110 米,SB665 和 SB671 两个孔仍在等待化验结果;Clark Tunnel Fault Zone 的后续钻探继续显示近地表高品位,SB606 见 25.4 米、金品位 4.5 g/t,SB605 见 25.0 米、金品位 2.3 g/t,其锑和钨化验结果尚未出炉。

Something wrong? Tell us

Event follow-ups

See the full event

More actions