跳到正文
Miningmx · 行业资讯·· 3 天前AI 评分57.3

Allied Gold拟派息并回购股份,季度经营现金流降至1230万美元

Allied Gold plans shareholder payouts even as costs rise

本站公开

AI 导读

Allied Gold计划推出股息和股份回购计划,拟自2027年起派发基础股息,并回购最多占公众流通股10%的股份,尚待多伦多证券交易所批准。9月季度经营现金流入降至1230万美元,上年同期为1.821亿美元;全维持成本上升14%至2378美元/盎司,黄金产量增长5%至91195盎司。埃塞俄比亚Kurmuk新矿已投产,预计今年贡献2.5万至3.5万盎司,2027年增至24万至27万盎司。

正文 · 原文

中文译文生成中,先为你显示原文。

ALLIED Gold plans to introduce a dividend and share buyback programme despite a sharp drop in quarterly cash inflows and rising operating costs, as production gets underway at its new Kurmuk mine in Ethiopia.

The Toronto- and New York-listed gold producer said it was considering a base dividend from 2027. It also plans a share buyback programme of up to 10% of its public float, subject to approval from the Toronto Stock Exchange.

Allied said its capital allocation priorities included “continuing to invest in growth, maintaining a strong balance sheet and returning capital to shareholders”.

The plans follow a decline in operating cash inflows to $12.3m in the September quarter from $182.1m a year earlier, despite higher gold prices and increased production.

The decrease partly reflected $93.8m in receipts from gold streaming arrangements in the previous year, which were not repeated.

Higher tax payments and working capital needs, including the accumulation of ore stockpiles and the timing of value-added tax recoveries, also affected cash generation.

All-in sustaining costs (AISC) increased 14% to $2,378/oz from $2,092/oz, while gold production rose 5% to 91,195 oz.

Revenue was up 17% to $358.1m and adjusted earnings increased to $49.3m from $33.3m.

Costs rose sharply at Sadiola in Mali, where AISC increased to $2,876/oz from $2,224/oz. Production was almost unchanged at 42,291 oz, although Allied expects operational improvements and higher-grade ore to support stronger performance in the fourth quarter.

In Côte d'Ivoire, production at Bonikro increased 30% to 28,644 oz, while AISC declined to $1,670/oz.

Allied expects cash generation to improve following the start of production at Kurmuk, which commenced operations after the September quarter ended. The mine is expected to contribute 25,000 to 35,000 oz this year before increasing production to between 240,000 and 270,000 oz in 2027.

Group production is forecast to rise to between 615,000 and 670,000 oz next year, compared with 400,000 to 435,000 oz expected in 2026.

Kurmuk is expected to become Allied's lowest-cost operation, while the completion of major construction work should reduce capital expenditure.

Allied ended September with $379.1m in cash, compared with $479.8m at the end of December 2025.

The company has also resumed evaluating the next stages of its phased expansion at Sadiola following the collapse of a proposed takeover by China's Zijin Gold, which instead acquired a 9.2% stake in Allied through a $295m investment completed in August.

来源:Miningmx · 行业资讯 · miningmx.com

许可:负责人声明许可;来源异议或指示可逐项收紧

原始来源可追溯;中文内容由 AI 辅助生成或翻译,核对细节请看原文。

相关报道

代表稿

Allied Gold埃塞俄比亚Kurmuk矿启动湿法调试,目标近期产出首批黄金

Mining Connection · 行业资讯 · 2026-11-02

Allied Gold表示,埃塞俄比亚Kurmuk矿已开始湿法调试,目标在11月和12月产出2.5万至3.5万盎司黄金,并在此期间实现商业化生产。公司预计2027年产量为24万至27万盎司,2028年约30万盎司;矿石预计本周进入选矿流程,随后产出首批黄金。矿山及选厂基础设施已完工,包括蓄水与尾矿设施、主通道和采矿服务区,矿石堆存接近约三个月给矿量的计划水平。

最新进展正在阅读

Allied Gold拟派息并回购股份,季度经营现金流降至1230万美元

Miningmx · 行业资讯 · 2026-11-06 16:47

Allied Gold计划推出股息和股份回购计划,拟自2027年起派发基础股息,并回购最多占公众流通股10%的股份,尚待多伦多证券交易所批准。9月季度经营现金流入降至1230万美元,上年同期为1.821亿美元;全维持成本上升14%至2378美元/盎司,黄金产量增长5%至91195盎司。埃塞俄比亚Kurmuk新矿已投产,预计今年贡献2.5万至3.5万盎司,2027年增至24万至27万盎司。

内容有误?告诉我们

文中公司资料

  • 紫金矿业

    紫金黄金对Allied Gold的收购提议未成,转而以2.95亿美元投资取得Allied 9.2%股份。

    资料出处:原文依据

事件后续

查看完整事件

更多操作