跳到正文
The Northern Miner · 行业资讯· FREDERIC TOMESCO·· 10 天前精选AI 评分72.0

力拓奥尤陶勒盖铜矿发生岩崩后逐步恢复地下作业

Rio begins Oyu Tolgoi copper restart after rockfall

本站公开

AI 导读

力拓表示,蒙古奥尤陶勒盖铜矿在发生地震引发的岩崩、导致停产一天后,正逐步恢复地下作业。事故造成三名员工受伤,其中两人仍在接受治疗,伤势无生命危险;岩崩限于生产区旁的临时储存区,安全审查已完成,力拓称未对崩落区及其运营基础设施造成结构性影响。力拓未量化产量损失,也未给出复产完成时间表,其纽约股价周五早盘下跌1.8%至81.76美元。该矿第三季度铜产量同比增长27%,此前曾因边境限制导致铜精矿出口减少70%。

推荐理由

事故发生在奥尤陶勒盖地下矿,停产与复产节奏牵动力拓铜产量增长目标。

正文 · 原文

查看配图A view of the Oyu Tolgoi site. Credit: Rio Tinto.

Rio Tinto (ASX, LSE, NYSE: RIO) said it’s progressively restarting underground operations at Mongolia’s Oyu Tolgoi mine a day after a seismic event triggered a rockfall, stopping production at a cornerstone asset of the company’s copper growth strategy.

Three employees were injured and two continue to receive treatment for non-life-threatening injuries, the company said Friday. Thursday’s rockfall was confined to a temporary storage zone beside the production area, and safety reviews have been completed.

The incident caused “no structural impact to the cave or its operating infrastructure,” Rio said in Friday’s statement.

Rio didn’t quantify lost production or provide a timetable for completing the restart.

Shares in Rio Tinto dropped 1.8% to $81.76 in New York trading Friday morning, cutting the company’s market value to about $143.3 billion (C$201 billion). The stock has traded between $67.74 and $112.58 in the past year.

Key role

The disruption comes as Oyu Tolgoi delivers some of Rio’s strongest operating growth even as it encounters border restrictions that recently curtailed copper concentrate exports by 70%. Copper production rose 27% in the third quarter from a year earlier and 29% over the first nine months.

The operation was running at an annualized rate of about 450,000 tonnes during the quarter, CEO Simon Trott said in Rio’s Oct. 14 production update.

That expansion makes uninterrupted underground mining increasingly important to the group. While Oyu Tolgoi’s output climbed sharply, Rio’s third-quarter consolidated copper production was little changed at 205,000 tonnes. Group copper output rose just 1% over the first nine months, highlighting the Mongolian operation’s key role.

Before the incident, Rio reaffirmed its target for Oyu Tolgoi’s combined underground and open-pit operations to average about 500,000 tonnes of recoverable copper annually from 2028 through 2036. Rio expects the operation to become the world’s fourth-largest copper mine by 2030.

Located in Mongolia’s South Gobi region, Oyu Tolgoi is managed by Rio, which owns 66%, while the Mongolian government holds 34%. Open-pit mining began in 2011, followed by concentrate production in 2013. Sustainable underground production started in March 2023, opening access to the deposit’s most valuable mineralization.

Underground value

More than 80% of the deposit’s total value lies underground, according to Rio. Its development underpins the company’s long-term investment in the operation and its ambition to expand copper supply for electrification and other uses.

The underground mine uses block caving, a method in which miners remove rock beneath an orebody, allowing it to fracture and collapse under its own weight. Broken ore is collected through draw points and transported for crushing and delivery to the surface.

Rio consolidated its ownership in December 2022 by acquiring the remaining minority interests in Turquoise Hill Resources, simplifying the ownership structure ahead of underground production. The transaction increased Rio’s interest in Oyu Tolgoi from about 34% to 66%.

Print

来源:The Northern Miner · 行业资讯 · northernminer.com

许可:负责人声明许可;来源异议或指示可逐项收紧

原始来源可追溯;中文内容由 AI 辅助生成或翻译,核对细节请看原文。

相关报道

代表稿当事方或官方发布

力拓:Oyu Tolgoi 铜矿地震后逐步恢复井下作业

力拓 · 官方动态 · 2026-10-30

力拓通报,蒙古 Oyu Tolgoi 铜矿在完成安全审查后正逐步恢复井下作业。2026 年 10 月 29 日发生的地震事件导致生产区附近一处临时储存区出现局部岩崩,未对采场及其运营基础设施造成结构性影响,两名员工因非致命伤继续接受治疗。Oyu Tolgoi 正与相关部门密切合作,并持续为员工和承包商提供支持。

最新进展当事方或官方发布

力拓:Oyu Tolgoi 铜矿地震后逐步恢复井下作业

力拓 · 官方动态 · 2026-10-30

力拓通报,蒙古 Oyu Tolgoi 铜矿在完成安全审查后正逐步恢复井下作业。2026 年 10 月 29 日发生的地震事件导致生产区附近一处临时储存区出现局部岩崩,未对采场及其运营基础设施造成结构性影响,两名员工因非致命伤继续接受治疗。Oyu Tolgoi 正与相关部门密切合作,并持续为员工和承包商提供支持。

内容有误?告诉我们

事件后续

查看完整事件

更多操作